Contract Title:Vehicle Upfit and Service Bodies
<br />Bid Number:2023-157
<br />Submittal Deadline:1/16/2024
<br />Procurement Professional:Jenny Chang
<br />Item Description Estimated Value Markup Extended Markup Extended
<br />1 Body lighting $10,000.00 5%$10,500.00
<br />2 Partitions $20,000.00 5%$21,000.00
<br />3 Shelving $20,000.00 5%$21,000.00
<br />4 Cab storage $5,000.00 5%$5,250.00
<br />5 Cabinets $30,000.00 5%$31,500.00
<br />6 Hooks $2,000.00 5%$2,100.00
<br />7 After-market heaters $5,000.00 25%$6,250.00
<br />8 Service body $300,000.00 20%$360,000.00
<br />9 Bed liners $25,000.00 5%$26,250.00
<br />10 Hydraulicly or electrically operated
<br />crane $125,000.00 20%$150,000.00
<br />11 Hydraulics for generator $3,000.00 25%$3,750.00
<br />12 Hydraulicly operated outriggers for
<br />cranes $5,000.00 20%$6,000.00
<br />13 Hydraulicly operated tool circuit $15,000.00 25%$18,750.00
<br />14 Other miscellaneous hydraulic-related
<br />needs $30,000.00 25%$37,500.00
<br />15 Miscellaneous items not listed $75,000.00 5%$78,750.00
<br />16 Cargo area flooring $10,000.00 5%$10,500.00
<br />Subtotal $206,850.00 Subtotal $582,250.00
<br />Item Description Unit of Measure Estimated Quantity Unit Price Extended Unit Price Extended
<br />1 Installation Labor, including incidental
<br />supplies such as paint HOUR 500 $195.00 $97,500.00 $145.00 $72,500.00
<br />2 Pick-Up FLAT FEE 3 $125.00 $375.00 $0.00 $0.00
<br />3 Standard Delivery FLAT FEE 3 $125.00 $375.00 $0.00 $0.00
<br />4 Expedite: Delivery within 60 days
<br />from receipt of vehicle FLAT FEE 1 $500.00 $500.00 $0.00 $0.00
<br /> Subtotal: $98,750.00 Subtotal: $72,500.00
<br />Part 1+2 Subtotal:$305,600.00 Part 1+2 Subtotal:$654,750.00
<br />Tax Rate 9.9%Tax Rate 9.9%
<br />Tax $30,254.40 Tax $64,820.25
<br />Total $335,854.40 Total $719,570.25
<br />SeaTac, WA Arlington, WA
<br />Part 1 - Equipment
<br />Part 2 - Labor and Delivery
<br />City of Everett
<br /> Bid Tabulation - Part B
<br />Al Van Equip NW Inc Aalbu Brothers Fabrication
|