My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak, Inc. 2/23/2024 Amendment 4
>
Contracts
>
6 Years Then Destroy
>
2024
>
Otak, Inc. 2/23/2024 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 11:14:55 AM
Creation date
2/23/2024 11:14:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak, Inc.
Approval Date
2/23/2024
Council Approval Date
2/7/2024
End Date
12/31/2024
Department
Public Works
Department Project Manager
Emily Coba
Subject / Project Title
Diking District No. 5 Dike Repairs
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Tracking Number
0000245
Total Compensation
$15,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Scope of Work <br />Continued <br /> <br />D D 5 D i k e R e p a i r D e s i g n – P e r m i t t i n g C o m m e n t R e s p o n s e S u p p o r t <br /> 2 <br />O:\PROJECT\32700\32758\Contract\Amendment No 4_32758C.00\SCOPE_Amend 4_Draft_2024_0115.docx otak <br />This task is complete. <br /> <br />Task 12 – Agencies Comment Response Support <br /> <br />Task 12.1 - Project Management and Coordination <br />Otak will manage, coordinate, and oversee the team to complete the scope of services within the <br />project schedule. The duration of the Project is assumed to be approximately six months, ending <br />in July 2024. It is assumed that USCOE Comment Response and meetings drives the schedule <br />duration. <br /> <br />Task 12.2 – Comment Review and Response Support <br /> <br />Task 12.2.A - Review Agencies Comments and Related Design Documents <br />The purpose of this task is to review Agencies comments and review design documents and <br />determine reasons for design decisions. Design documents include 100% plans, previous <br />correspondence with the City and design report. <br /> <br />Task 12.2.A Assumptions <br /> Up to (2) Intake meeting online with City staff (1-hour long) attended by up to three Otak <br />staff members is included. Meetings are assumed to be hosted online by the City. <br />Multiple agency comments will be reviewed during each meeting. <br /> <br />Task 12.2.B - Respond to Agencies Comments <br />The purpose of this task is to prepare responses to Agencies’ comments related to the <br />engineering design completed in April, 2022. Otak will provide a narrative response for each <br />agency comment and supporting exhibits to describe the site constraints and basis of design. <br /> <br />Task 12.2.B Deliverables <br /> Narrative response for comments in Word – 2 Drafts Versions and 1 Final Version <br />(electronic .doc). <br /> Exhibits to support narrative response – 2 Draft Versions and 1 Final (electronic .pdf) <br /> <br />Task 12.2.B Assumptions <br /> Up to four total exhibits will be developed. The exhibits will be in the form of Bluebeam <br />Markups of existing design drawings, or GIS figures. <br /> Data for GIS, such as wetland delineations are available in GIS format and will be <br />provided by City if not already obtained. <br /> City will provide one set of consolidated comments for the first draft of comment <br />responses and exhibits. Draft 2 will address the City’s comments. <br /> Final deliverables will include incorporating comments from meeting with Agencies in <br />Task 2.4 below. It is assumed that addressing Agencies comments after the meeting will <br />include text revisions to narrative responses without addition of paragraphs or sheets and
The URL can be used to link to this page
Your browser does not support the video tag.