My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 7 ELEVEN 2024-02-29
>
Address Records
>
HARDESON RD
>
7500
>
7 ELEVEN
>
7500 HARDESON RD 7 ELEVEN 2024-02-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 10:38:48 AM
Creation date
2/24/2024 8:51:36 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Tenant Name
7 ELEVEN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Torn sheets must be replaced and open seams repaired. <br />• If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely <br />removed and replaced. <br />• When the plastic is no longer needed, it shall be completely removed. <br />• If tires are used to weight down the plastic sheeting, they must be disposed of properly. <br />Filter Fabric Fence (BMP C233) <br />• Any damage shall be repaired immediately. <br />• If concentrated flows are evident uphill of the fence, they must be intercepted and <br />conveyed to a sediment pond. <br />• Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to <br />flow, and causing channelization of flows parallel to the fence. If this occurs, replace the <br />fence or remove the trapped sediment. <br />• Sediment deposits shall be removed when the deposit reaches approximately one-third the <br />height of the silt fence, or a second silt fence shall be installed. <br />• If the filter fabric (geotextile) has deteriorated due to ultraviolet breakdown, it shall be <br />replaced. <br />If the ESC facilities are damaged, or if the Engineer of Record or City determines that existing <br />controls are inadequate, the Contractor shall install additional measures as required. <br />The maintenance inspection report will be made after each inspection. Copies of the report forms <br />to be completed by the Construction SWPPP Coordinator are included as Appendix C of this <br />report. Completed forms will be provided to the City Inspector and will also be maintained onsite <br />during the entire construction project. If construction activities or design modifications are made to <br />the site plan that could impact stormwater or if the Engineer of Record determines that the <br />measures are not adequate to prevent erosion and the discharge of sediment from the site <br />(based on turbidity measurements), this Construction SWPPP will be amended appropriately. The <br />amended Construction SWPPP will have a description of the new activities that contribute to the <br />increased pollutant loading and the planned source control activities. <br />All temporary Construction SWPPP BMPs shall be removed within 30 days after achieving final <br />site stabilization. <br />7.12 Manage the Project <br />Materials on Hand (BMP C150) will be implemented. <br />The following practices will be required during construction to properly manage activities: <br />• Comply with seasonal work limitations. <br />• Inspect, maintain, and repair BMPs. <br />• Identify a CESCL (BMP C160) <br />• Maintain the Construction SWPPP onsite at all times, including narrative and plans. <br />• Keep materials on hand (BMP C150) <br />Construction StPollution Prevention Plan 101000 <br />Everett 7-Eleven <br />Parking <br />Expansion 9 <br />2180309.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.