Laserfiche WebLink
• Torn sheets must be replaced and open seams repaired. <br />• If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely <br />removed and replaced. <br />• When the plastic is no longer needed, it shall be completely removed. <br />• If tires are used to weight down the plastic sheeting, they must be disposed of properly. <br />Filter Fabric Fence (BMP C233) <br />• Any damage shall be repaired immediately. <br />• If concentrated flows are evident uphill of the fence, they must be intercepted and <br />conveyed to a sediment pond. <br />• Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to <br />flow, and causing channelization of flows parallel to the fence. If this occurs, replace the <br />fence or remove the trapped sediment. <br />• Sediment deposits shall be removed when the deposit reaches approximately one-third the <br />height of the silt fence, or a second silt fence shall be installed. <br />• If the filter fabric (geotextile) has deteriorated due to ultraviolet breakdown, it shall be <br />replaced. <br />If the ESC facilities are damaged, or if the Engineer of Record or City determines that existing <br />controls are inadequate, the Contractor shall install additional measures as required. <br />The maintenance inspection report will be made after each inspection. Copies of the report forms <br />to be completed by the Construction SWPPP Coordinator are included as Appendix C of this <br />report. Completed forms will be provided to the City Inspector and will also be maintained onsite <br />during the entire construction project. If construction activities or design modifications are made to <br />the site plan that could impact stormwater or if the Engineer of Record determines that the <br />measures are not adequate to prevent erosion and the discharge of sediment from the site <br />(based on turbidity measurements), this Construction SWPPP will be amended appropriately. The <br />amended Construction SWPPP will have a description of the new activities that contribute to the <br />increased pollutant loading and the planned source control activities. <br />All temporary Construction SWPPP BMPs shall be removed within 30 days after achieving final <br />site stabilization. <br />7.12 Manage the Project <br />Materials on Hand (BMP C150) will be implemented. <br />The following practices will be required during construction to properly manage activities: <br />• Comply with seasonal work limitations. <br />• Inspect, maintain, and repair BMPs. <br />• Identify a CESCL (BMP C160) <br />• Maintain the Construction SWPPP onsite at all times, including narrative and plans. <br />• Keep materials on hand (BMP C150) <br />Construction StPollution Prevention Plan 101000 <br />Everett 7-Eleven <br />Parking <br />Expansion 9 <br />2180309.11 <br />