Laserfiche WebLink
If vehicles are entering or exiting the site at points other than the approved entrances, <br />temporary fencing shall be installed to control traffic. <br />Sediment Trap (BMP C240) <br />• The sediment trap shall be inspected once a week during the dry season and after every <br />rainfall event during the wet season. <br />• Sediment shall be removed from the trap when it reaches 1 foot in depth. <br />• The staff gauge shall be inspected and replaced if damaged then repositioned after <br />dredging. Any damage to slopes shall be repaired. <br />• Check pond slopes for raveling. Concentrated flows shall not be allowed to flow down the <br />pond slopes without providing rock armoring. <br />• Inspect outlet to ensure it is functioning properly and is not plugged. <br />Temporary and Permanent Seeding (BMP C120) <br />• Seeding may be used throughout the project on disturbed areas. During the dry season, <br />areas that have reached final grade, or are not being actively worked, shall be seeded <br />within 15 days. Seeded areas shall be supplied with adequate moisture, but not watered to <br />the extent that it causes runoff. <br />• During the wet season, all disturbed areas not being actively worked shall be seeded or <br />stabilized with mulch or plastic sheeting. <br />• To prevent seed from being washed away, confirm that all other approved <br />erosion/sedimentation control facilities have been installed and are functioning properly. <br />• Any seeded areas that fail to establish 80 percent cover (100 percent cover for areas that <br />receive sheet or concentrated flows) shall be reseeded. If reseeding is ineffective, an <br />alternate method shall be used. <br />• Seeded areas shall be inspected after every rainfall event during the wet season. Any <br />areas that experience erosion shall be reseeded and protected by mulch. If the erosion <br />problem is drainage related, the problem shall be fixed and the eroded area reseeded and <br />protected by mulch. <br />• Seeding shall not be used in areas subject to heavy vehicular traffic. <br />Mulching (BMP C121) <br />Mulching shall be inspected once a week during the dry season and after every rainfall <br />event during the wet season. <br />Mulch shall be inspected to verify that the proper thickness is being maintained if <br />applicable. <br />Any areas that experience erosion shall be re -mulched and/or protected with a net or <br />blanket. If the erosion problem is drainage related, the problem shall be fixed and the <br />eroded area re -mulched. <br />Plastic Covering (BMP C123) <br />Plastic sheeting shall be inspected once a week during both the wet and dry season. <br />Construction StPollution Prevention Plan 101000 <br />Everett 7-Eleven <br />Parking <br />Expansion 8 <br />2180309.11 <br />