Laserfiche WebLink
3 <br />0 <br />N <br />N <br />N <br />U TI <br />3x1 <br />M n• <br />i <br />i <br />i <br />i <br />a— _ _ _ _ <br />OH LTG 6 <br />o —4"C. P o e <br />M ° 3-2"C. TEL/CBL/GRD <br />0 2-1"C. COM <br />2-0.75"C. P/LTG <br />e o 0 3 <br />\, 480/27QU 240/1020V, 30, <br />P. + LTG J \ \ <br />MATCHLINE +125'-0" <br />1 a <br />0 <br />O <br />H <br />I <br />II ' <br />2 C. P (50A,120/24OV) I x <br />I <br />I I <br />I I I I <br />I I iI I <br />I I I x <br />I I I <br />I I / <br />Ix I <br />II <br />2"C. P (60A,120/24OV, <br />I <br />1 <br />x <br />OOA, 120/24OV, r 1 <br />10 METER/MAIN <br />PANEL II I /x <br />X— _ <br />PP X V <br />r1I1` THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY <br />GENERAL NOTES <br />OH LTG Q Q <br />lh7J 2 lh7J <br />ELECTRICAL SITE PLAN - NORTHWEST p <br />SCALE IN FEET V <br />20 0 20 40 V <br />SHEET NOTES <br />1. SCOPE OF WORK, THIS SHEET, INCLUDES: 1. LIGHTPOLE: SNOPUD INSTALLED POLE MOUNTED LUMINIARE. WOOD <br />POLE AND POLE HEIGHT TO MATCH EXISTING LIGHTPOLES. <br />1F. POLE MOUNTED LUMINAIRES (7). LUMINAIRES POWERED BY <br />PUD AERIAL CIRCUIT. POLES, LUMINAIRES, CIRCUIT 2. OVERHEAD POWER: SNOPUD INSTALLED AERIAL CIRCUIT FOR LIGHT <br />1:7777=C777= <br />POLES. <br />3. CONNECT TO EXISTING OVERHEAD LIGHT CIRCUIT. SNOPUD TO <br />OH LTG_ <br />xz _ <br />x <br />ply 1 2 <br />0 <br />w <br />ELECTRICAL SITE PLAN - NORTHEAST <br />SCALE IN FEET <br />20 C 20 40 <br />ww <br />S Z <br />H J <br />Z U <br />ply <br />O <br />W <br />PROJECT ENGINEER: SCALE : PORT OF EVERETT DWG. N0. <br />I END ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY J..E. DAVID NOTED E2.00 <br />_ ^ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE Q'�' <br />/j CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. w ✓ DESIGNED BY: DATE �yq���� W /(-'�� u <br />Port O✓ ® I ® 3240 Eastlake A--E WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, E. DAVID JULY 2022 M U LL • • R � G HT LOOP ROADS CIP NO. <br />EVERETT 8eatt e, Was ae on 98102 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF PHASE <br />P P 6-8-008-01 <br />P: 206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY 3 Q; DRAWN BY: CHECKED BY: A of <br />ENGINEERS, INC. www.pnden inner—_ 8/10/22 EJD ADDENDUM #1 AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN ¢� J. CAMPBELL E. DAVID PROJECT <br />P.O. BOX 538 P APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED ELECTRICAL SITE PLAN NO. PD—WP-2022-07 <br />EVERETT, WA 98206 & 7/2722 EJD ISSUED FOR BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT APPROVED BY: <br />(425) 259-3164 N0. DATE BY REVISION DIRECTLY OR INDIRECTLY TO END. 07/26/2022 NORTHWEST & NORTHEAST SHEET NO. 48 OF 48 <br />