Laserfiche WebLink
b. The use is part of a mixed -use project or area that includes water - <br />dependent uses; or <br />C. The site is upriver from the SR 529 bridge, or is located along Union or <br />Steamboat Sloughs. <br />(exhibit 1, staff report, page 6; Shoreline Master Program, Use Regulations, 5.5 -- <br />Commercial Development) <br />43. The Everett Planning Department reviewed the requirements for commercial <br />development and the Use Regulations of the Shoreline Master Program and <br />determined that the proposed development would provide significant shoreline <br />public access in a mixed -use project involving water -dependent and water - <br />oriented uses. (exhibit 1, staff report, page 6) <br />44. As part of the Use Regulations of the Shoreline Master Program, all commercial <br />loading and service areas are to be located on the upland side of the commercial <br />activity, and efforts must be made to screen the loading and service area from <br />the shoreline and waterbody. The City recommended this requirement as a <br />condition of approval. (exhibit 1, staff report, pages 6, 7 and 15, condition #19) <br />45. Parking facilities within the shoreline are to be designed and landscaped to <br />minimize the adverse impacts on adjacent shorelines and abutting properties. <br />The landscaping of the parking areas must be developed consistent with City of <br />Everett zoning standards. According to the City, detailed landscape plans are <br />required to be submitted with building permit applications to ensure these <br />requirements are satisfied. (exhibit 1, staff report, page 7) <br />46. Apartment buildings are projected to be constructed on Lots A9 and Al0. There <br />will be parking provided on the parcels east of these buildings. As depicted in <br />exhibit 11 b, which is part of the Development Agreement, there are additional <br />buildings along West Marine View Drive where parking is proposed. According <br />to the Everett Planning Department, prior to the time this parking is constructed, <br />parking can be placed on the east side of the site, if additional landscaping is <br />provided along the West Marine View Drive. (exhibit 1, staff report, page 7) <br />47. Detailed parking lot designs will be provided with the submittal of building permit <br />application. (exhibit 1, staff report, page 7) <br />48. The recreational uses, as depicted on the Plan Sets and the Applicant's <br />narrative, indicate that recreational uses are a major component of the proposed <br />redevelopment project. Both water -dependent and water -related uses have been <br />included and addressed. The water -dependent uses include the marinas that <br />straddle the site and supporting upland facilities. Water-related/oriented <br />recreational uses include shoreline pedestrian paths, overwater public piers and <br />a park oriented to the water. Recreational facilities will be provided with <br />adequate sanitary facilities. Three restrooms will serve the marina and will be <br />devoted to marina use. A fourth restroom will provide service to the general <br />11 <br />