Laserfiche WebLink
public. (exhibit 1, staff report, page i; testimony of Mr. Jimerson; exhibit 4, plan <br />set, sheets P1.01 and P1.02) <br />49. Residential development on -site includes requirements that multiple -family <br />buildings be oriented to views of the shoreline when feasible, while continuing to <br />protect views of the shoreline for other properties. The City submitted that the <br />rectangular shaped peninsula of the site affords development ample opportunity <br />to meet these standards. (exhibit 1, staff report, page 8, exhibit 4, plan set; <br />testimony of Mr. Jimerson) <br />50. Signs on -site must comply with the Development Agreement provisions, as well <br />as the guidelines in the City of Everett. Sign permits will be reviewed for <br />compliance with these standards. (exhibit 1, staff report, page 8) <br />51. Solid waste disposal and collection facilities in the shoreline area must be located <br />and constructed and screened to prevent impacts related to health, sanitation <br />and water quality. They will also be designed to control odor, provide aesthetic <br />relief and public safety. (exhibit 1, staff report, page 8) <br />52. Placement of the utilities is governed by the Development Agreement, as well as <br />conditions of this decision. (exhibit 1, staff report, page 8; exhibit 1, staff report, <br />page 15, conditions 21 and 22) <br />53. A continuous public esplanade is projected to be constructed along the entire <br />1.5-mile shoreline of the project. A part of the esplanade has been developed, <br />but the remainder will be constructed as part of the instant permit. The width of <br />the esplanade will be for bikes and pedestrians. Per the Development <br />Agreement between the City and the Port, each phase and district in the project <br />requires the adjacent esplanade segments to be completed as part of the <br />required amenities. (exhibit 3, project narrative, page 5; testimony of Mr. <br />Jimerson) <br />54. As part of the esplanade there will be two vista areas (Weaver and Chamfer) as <br />depicted in exhibit 4. Segments along the southern and western edges (adjacent <br />to the Central Marina and Snohomish River) will be completed in the initial <br />phases of work approved by this shoreline permit. In later phases of the <br />development the esplanade on the north edge of Waterfront Place Central, <br />adjacent to the North Marina and Timberman Vista, will be completed. The <br />completed esplanade will include a variety of amenities, including street <br />furnishings, landscaping, viewing areas and lighting. The entire esplanade and <br />amenities are subject to conformity with the conditions in the Development <br />Agreement. (exhibit 3, project narrative, pages 5 and 6; exhibit 4, plan set, sheet <br />#P1.02, sheet #P2.01, sheet #P2.09; exhibit 11 a, Development Agreement; <br />exhibit 13, EIS; exhibit 16, powerpoint) <br />12 <br />