My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 14TH ST 2024-03-01
>
Address Records
>
14TH ST
>
1001
>
1001 14TH ST 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:31:55 PM
Creation date
2/24/2024 10:01:33 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions based on Public Works Department submittals <br />All proposed development plans must clearly label all proposed roadways as <br />either public or private. <br />2. Construction permits, inspections and final approvals will be required for the <br />individual development projects from City of Everett Permit Services. <br />3. Temporary erosion control measures for construction activity must be operational <br />prior to commencement of any construction related activities. <br />4. As each development project comes in for permit, a review will determine if the <br />project is required to comply with the pretreatment code for grease control. If <br />required, a review of the project's plumbing plans (i.e. for a restaurant and any <br />other kitchen/food service facilities planned) will eventually need to be conducted <br />to confirm compliance. These facilities in the complex will need to be served by <br />a gravity grease interceptor properly sized and installed per 2012 UPC and COE <br />ordinance criteria (#3071-08). In the meantime, designers and/or engineers <br />working on the development plans may proactively contact the City's Industrial <br />Pretreatment (IPT) Division at 425-257-8224. <br />5. When individual projects supported by this Shoreline Permit and Binding Site <br />Plan are permitted for construction, Traffic Mitigation Fees and System <br />Development Fees may be assessed at that time. Traffic Mitigation shall be due <br />in accordance with Ordinance 3387-14 (codified as EMC 18.40) and subsequent <br />revision. System Development fees for connection to the sewer and water <br />systems shall be consistent with Ordinance 3095-08 (codified as EMC <br />14.08.135) and subsequent revision may be applicable. These charges are <br />based on projected water usage and can be substantial. The Applicant is <br />encouraged to obtain a copy of the Ordinances and determine estimated charges <br />prior to building permit application. The actual charges shall be computed by the <br />Public Works Department per the ordinances in effect and according to the <br />information on the approved plans at the time of building permit issuance. <br />6. Parking for each phase shall be provided as identified in the Waterfront Place <br />Center Parking Management Plan (WPC PMP) and approved by the City of <br />Everett. The WPC PMP shall be updated for each new phase of construction <br />and shall include a review of parking conditions for all previous phases of <br />construction, including parking utilization counts and evaluation of parking <br />demand calculations. Contact Michael Brick in Traffic Engineering at (425)257- <br />7790 or mbrick(a-)-everettwa.gov to discuss specific technical comments on the <br />current draft WPC PMP. <br />With each new phase after Phase 1 B, an updated parking management plan <br />shall be provided to the City for approval prior to commencing construction of any <br />109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.