Laserfiche WebLink
2022 Stormwater System Development <br />Fee Calculations <br />Permit M PW2208-010 <br />Additional Notes: <br />Project Address: 1001 14th ST <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Waterfront Place Central Phase 1 - Preload <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />Prepared By: Thad Newport Date: 10/18/2022 <br />Outside City Limits? INo <br />*Adds a 25%Surcharge <br />Supportive Housing Credit? INo <br />*Reduces by 80% <br />1 Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: BXXXX-XXX Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />- SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />Stormwater System Development Fees: <br />Permit #: PW2208-010 Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />13,465 SF <br />Stormwater System Dev Fee: <br />$3,605.93 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />