My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Willamette Cultural Resources Associates, Ltd. 3/1/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Willamette Cultural Resources Associates, Ltd. 3/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 1:28:40 PM
Creation date
3/1/2024 1:28:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Willamette Cultural Resources Associates, Ltd.
Approval Date
3/1/2024
End Date
6/1/2024
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Cultural Resource Survey Report for Forest Park Pickleball
Tracking Number
0004209
Total Compensation
$22,577.83
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Parks and Facilities <br />Forest Park Cultural Resources Survey and Reporting <br />January 12, 2024 <br /> Page 5 <br />Agreement (MOA) stipulations, or other draft written deliverables that may be requested during <br />the course of the mitigation development process. <br />Assumptions <br /> WillametteCRA assumes up to four (4), one-hour-long virtual EO 21-02 mitigation <br />negotiation meetings between WillametteCRA, the City of Everett Parks and <br />Facilities, and the DAHP. <br /> WillametteCRA assumes up to two (2) hours of additional time for impromptu <br />meetings or telephone calls. <br /> WillametteCRA assumes up to four (4) hours of additional time for miscellaneous <br />technical research, development of mitigation measures, and other tasks that may be <br />required during the resolution of Adverse Impacts. <br /> WillametteCRA assumes up to sixteen (16) hours to prepare draft written statements <br />for City of Everett Parks and Facilities. <br /> WillametteCRA assumes all draft written statements will be conveyed to the City of <br />Everett Parks and Facilities by email or as a Word document email attachment. <br /> <br />Cost Proposal <br />The projected labor and direct costs for Tasks 1 through 5 defined above are $18,940.95. The <br />project labor and direct costs for Task 6 (Management Reserve) are $3,636.88. The total <br />amount of project labor and direct costs for this project is $22,577.83. This is a fixed fee <br />inclusive of all labor and not to exceed the projected cost referenced above without prior written <br />authorization from the City of Everett Parks and Facilities. <br />Period of Performance <br />WillametteCRA will begin services upon receipt of signed agreement, will make every <br />reasonable effort to complete services in a timely manner considering the needs of the project <br />and will complete the project prior to June 1, 2024.
The URL can be used to link to this page
Your browser does not support the video tag.