My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8514 SHADOW WOOD DR Lot 3 2024-03-29
>
Address Records
>
SHADOW WOOD DR
>
8514
>
8514 SHADOW WOOD DR Lot 3 2024-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:29:58 AM
Creation date
3/6/2024 10:38:52 AM
Metadata
Fields
Template:
Address Document
Street Name
SHADOW WOOD DR
Street Number
8514
Unit
Lot 3
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. New Roads <br />Backfill compaction for new road construction should be accomplished by mechanical <br />compaction per WSDOT/APWA Specifications. Compaction up to the top 2 feet of a <br />trench by water settling may be done provided the entire water -settled portion of the <br />trench reaches 95% maximum density and the top 2 feet of the trench consists of <br />Controlled Density Fill as specified in Section 8-07 of this chapter. <br />E. Testing <br />Consistent with the above requirements and prior to placing any surface materials on <br />the roadway, it shall be the responsibility of the utility/developer/contractor to provide <br />density test reports certified by a professional engineer licensed in the State of <br />Washington. <br />A minimum of 1 density test shall be taken within every 200 feet of trench length and at <br />depths of 50 percent of trench depth and at the surface, or as specified by the Engineer. <br />Compaction of laterals or service line trenches shall be tested where required by the <br />Engineer. Certified copies of all test results shall be provided to the County. <br />F. Notification and Inspection <br />1. Consistent with Chapter 9 of these Standards, any developers, utilities, or others <br />intending to trench in existing or proposed county right-of-way shall notify the <br />Department of Planning and Development Services Inspection Section not less <br />than 3 working days prior to performing the work. This notification shall include: <br />Location of the work <br />ii. Permit number <br />iii. Method of compaction to be used <br />iv. Day and hour when compaction is to be done <br />v. Day and hour when testing is to be done <br />2. As set forth in Chapter 9, failure to notify may necessitate testing or retesting by <br />the County at the expense of the developer or utility. At the Engineer's discretion, <br />the work may be suspended pending satisfactory test results. <br />G. One Call System <br />1. Underground utilities shall comply with Chapter 19.122 RCW ("Underground <br />Utilities"). For reference purposes, the Underground Utilities Location Center One <br />Number Locater Services phone number is 811. <br />8-06 UTILITY INSTALLATION ON ROADWAY STRUCTURES <br />A. General <br />Attachment of utility lines to a roadway structure, including bridges, may be <br />allowed where such attachment conforms to sound engineering practice for <br />preserving the roadway structure and ensuring its safe operation, maintenance <br />and appearance. Attachment of any utility to any bridge within the county road <br />right-of-way requires the approval of the County Bridge Engineer. <br />8-13 Engineering Design and Development Standards <br />September 17, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.