Laserfiche WebLink
Subconsultant Fee Determination <br />Forest Park Pickleball Court Improvements <br />January 2024 <br />Prin <br />Survey <br />Sr Survey <br />Tech <br />Survey <br />Tech II <br />CAD Tech <br />II <br />Proj <br />Admin SUBTOTAL <br />Task SCOPE OF WORK $60.82 $49.27 $33.60 $39.42 $40.14 <br />1.0 <br />1.1 Project Coordination 1 $61 <br />1.2 Check-In Meetings 2 $122 <br />1.3 Document Management $0 <br />1.4 Project Schedule $0 <br />1.5 Subconsultant Management $0 <br />1.6 Quality Assurance / Quality Control 2 8 8 8 $1,100 <br />1.7 Invoicing 1 $40 <br />Subtotal:5 8 8 8 1 $1,323 <br />2.0 <br />2.1 Survey and Mapping 4 16 16 16 $2,200 <br />2.2 Site Reconnaissance and Document Search 2 $122 <br />Subtotal:6 16 16 16 0 $2,322 <br />3.0 <br />3.1 Document Review $0 <br />3.2 Site Visit $0 <br />3.3 Site Investigation $0 <br />3.4 Technical Support $0 <br />3.5 Report $0 <br />3.6 Document Review and Comment $0 <br />Subtotal:0 0 0 0 0 $0 <br />4.0 <br />4.1 Document Review $0 <br />4.2 Permit Application Support $0 <br />Subtotal:0 0 0 0 0 $0 <br />5.0 <br />5.1 Alternative Concept Plans $0 <br />5.2 Evaluation and Review $0 <br />Subtotal:0 0 0 0 0 $0 <br />6.0 <br />6.1 Prepare Plan Set $0 <br />Survey $0 <br />Demolition Plan $0 <br />TESC Plan $0 <br />Layout Plans $0 <br />Grading Plan $0 <br />Underdrainage Plan $0 <br />Planting Plan $0 <br />Irrigation Plan $0 <br />Site Construction Details $0 <br />Structural Wall Plan and Details $0 <br />Stormwater Plan $0 <br />Utility Plan $0 <br />Electrical Plan $0 <br />Lighting Plan $0 <br />6.2 Cost Opinion $0 <br />6.3 Specification Outline $0 <br />Subtotal:0 0 0 0 0 $0 <br />7.0 <br />7.1 Advance Plan Set $0 <br />Survey $0 <br />Demolition Plan $0 <br />TESC Plan $0 <br />Layout Plans $0 <br />Grading Plan $0 <br />Underdrainage Plan $0 <br />GEOTECHNICAL EVALUATION AND REPORTING <br />PACE Engineers Inc. <br />PROJECT ADMINISTRATION AND MANAGEMENT <br />SITE RECONNAISSANCE <br />PERMIT APPLICATION SUPPORT <br />CONCEPT ALTERNATIVES EVALUATION <br />60% DESIGN DEVELOPMENT <br />90% CONSTRUCTION DOCUMENTS <br />Page 1 of 2