Laserfiche WebLink
Subconsultant Fee Determination <br />Forest Park Pickleball Court Improvements <br />January 2024 <br />Prin <br />Survey <br />Sr Survey <br />Tech <br />Survey <br />Tech II <br />CAD Tech <br />II <br />Proj <br />Admin SUBTOTAL <br />Task SCOPE OF WORK $60.82 $49.27 $33.60 $39.42 $40.14 <br />PACE Engineers Inc. <br />Planting Plan $0 <br />Irrigation Plan $0 <br />Site Construction Details $0 <br />Structural Wall Plan and Details $0 <br />Stormwater Plan $0 <br />Utility Plan $0 <br />Electrical Plan $0 <br />Lighting Plan $0 <br />7.2 Documents and Reports $0 <br />7.3 Cost Opinion $0 <br />7.4 Specifications $0 <br />Subtotal:0 0 0 0 0 $0 <br />8.0 <br />8.1 Finalize Plan Set $0 <br />8.2 Finalize Documents and Reports $0 <br />8.3 Cost Opinion $0 <br />8.4 Specifications $0 <br />Subtotal:0 0 0 0 0 $0 <br />9.0 <br />9.1 Addenda $0 <br />9.2 Pre-Bid Meeting $0 <br />9.3 Bid Opening $0 <br />9.4 Review Submittals $0 <br />Subtotal:0 0 0 0 0 $0 <br />10.0 <br />Not currently included in Scope of Work $0 <br />Subtotal:0 0 0 0 0 $0 <br />11 24 24 24 1 $3,644 <br />TOTAL DIRECT SALARY COST $3,644 <br />Overhead (OH cost - including salary additives): <br />OH Rate X DSC of 179.78%X 3,644.12 6,551.40$ <br />Fixed Fee (FF): <br />FF Rate X DSC of 30%X 3,644.12 1,093.24$ <br />Subtotal 11,288.75$ <br />Reimbursables 1,200.00$ <br /> TOTAL:12,488.75$ <br />Prepared by: <br />Date: <br />CONSTRUCTION ADMINISTRATION SERVICES <br />Subtotal <br />(mileage, courier, copies)Utility Locate <br />100% BID DOCUMENTS <br />CONSTRUCTION BIDDING AND NEGOTIATION <br />Page 2 of 2