My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE Plans 2024-03-11
>
Address Records
>
100TH PL SE
>
1820
>
Plans
>
1820 100TH PL SE Plans 2024-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2024 3:58:47 PM
Creation date
3/11/2024 3:57:39 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Permit
B1801-042
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> • `��^ <br /> 107- DUST CONTROL/DEMOLITION PROTECTION <br /> Scoae of Work <br /> • Carpet mask: Required on ail exposed carpets from the affected area to the front entrance door <br /> • Cover any air ducts in work areas <br /> • Keep doors to work areas closed, as much as possible <br /> • Instail zipper wall to block off reception deck and areas where no work is to be performed <br /> • Plywood or OSB sheathing to temporary secure window openings <br /> 108- SITE CLEANUP <br /> Scope of Work <br /> • All construction debris will be removed from the job site. Work area will be left broom clean upon <br /> project completion <br /> 109 - DUMP RUN <br /> Scope of Work <br /> • All debris from demolition and construction will be removed to proper disposal site unless otherwise <br /> noted <br /> 110—WEATHER PROTECTION <br /> Scoae of Work <br /> • Contractor will install tarps/sheathing/building paper as necessary to protect building from weather as <br /> much as possible <br /> • Plywood or OSB sheathing to temporary secure window openings <br /> WOOD <br /> 401 - FRAMING <br /> Scope of Work <br /> Refer to attached plan of repair prepared by Mr. Basri Basri, PE, SE of Kenmore, WA(dated 01/16/2018). <br /> Provide and install the following: <br /> Framing <br /> • Contractor to install temporary shoring stud walls (installed on the interior)and remove, on an as <br /> needed basis on East face <br /> • Exterior Walls to be repaired and/or removed and replaced as needed, in affected areas per the Plan <br /> of Repair <br /> • Bottom plate—single 2x4 KD SPF in std & btr grade <br /> • Exterior walls -2x4 KD SPF in std & btr grade studs at 16" o/c. <br /> • Top plate—double 2x4 KD SPF in std & btr grade <br /> • Exterior wall plywood sheathing one side <br /> • Plywood sheathing thickness '/" <br /> • Nailing of wall sheathing will be: <br /> 8d-6 inch OC at edge <br /> 8d-12 inch OC in field <br /> • Window RO and locations will be same as existing <br /> . _� __ <br /> t � <br /> , Owner's Initia _ � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.