My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 100TH PL SE Plans 2024-03-11
>
Address Records
>
100TH PL SE
>
1820
>
Plans
>
1820 100TH PL SE Plans 2024-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2024 3:58:47 PM
Creation date
3/11/2024 3:57:39 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1820
Permit
B1801-042
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M .� <br /> Pa <br /> ! Anchor Bolts <br /> • Contractor to install %" x 8" Strong Bolt 2 (wedge anchor bolt)with Simpson BP %washer piate, per <br /> plan of repair recommendations <br /> • Anchor bolts to be installed only in areas where the wall has been damaged and the drywall is to be <br /> removed <br /> • Anchor bolts to be installed at 36" o-c <br /> Not Included in Contract <br /> • Restoration of lost elevation of the roof framing structure. Any significant deffection of the roof <br /> structure will be documented and addressed as an Additional Work Request. Currently no such work <br /> is anticipated. Leveling and/or repair of existing walls, floors, roof and ceitings. Contractor assumes all <br /> existing undamaged walls, floor and ceiling lines are plumb and level and free from damage (i.e. dry- <br /> rot, insect infestation, etc.) If any leveling and/or repair work for walls, floors, roof and ceilings is <br /> necessary, costs will be detailed and presented as a change order after demolition is complete and <br /> problems can viewed and be assessed. <br /> • Additional work requirements imposed by the City of Everett <br /> • Replacing damaged roof sheathing and/or installation of new roof sheathing <br /> 503 - SIDING <br /> Scope of Work <br /> Contractor to provide and replace siding on East face in same configuration as existing in areas outlined in <br /> the Demolition Plan. <br /> • Install 30-pound building paper <br /> • Install flashing, configuration to be similar to existing <br /> • Install wood siding to match, as close as possible existing material and profile, in areas where shown <br /> on Demolition Plan View <br /> • Unaffected siding will remain <br /> • Corner details to match existing corner details <br /> • Install metal flashing as necessary and similar to existing <br /> • Apply caulking in areas where repaired as required for painting <br /> 504- DOWNSPOUTS <br /> Scope of Work <br /> • Replace downspouts where damaged (profile to match existing) <br /> Not Included in Contract <br /> • Gutter system <br /> 505 - INSULATION <br /> Scope of Work <br /> • Provide and install insulation in exterior East walls in the affected areas of framing <br /> • Insulation in exterior walls will be fiberglass batt <br /> . Install insulation in attic insulation in the affected areas of drywall removal <br /> • Insulation in attic will be fiberglass batt <br /> • R value of installed insulation will be in accordance with current Building and Energy Code <br /> Not Included in Contract <br /> • Crawlspace insulation <br /> • Interior wall insulation <br /> . � � � <br /> , Owner's Initials / U <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.