My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1300 100TH PL SE CITY KIDS DAY CARE 2025-05-02
>
Address Records
>
100TH PL SE
>
1300
>
CITY KIDS DAY CARE
>
1300 100TH PL SE CITY KIDS DAY CARE 2025-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2025 7:54:02 AM
Creation date
3/11/2024 4:04:53 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH PL SE
Street Number
1300
Tenant Name
CITY KIDS DAY CARE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Overview <br /> Introduction <br /> This report describes the detention system for the stormwater runoff from the Country Club <br /> Daycare Center in Everett,Washington. The development consists of a 3,400 square foot <br /> daycare building, 1,500 square feet of paved sidewalk and parking area,and 1,600 square feet cf <br /> frontage improvement within the City right of way. <br /> Proled 1,031t011 <br /> The project site is located at the southwest corner of the intersection of 100th Place SE and <br /> Interurban Trail. It is situated in Section 19,Township 28 North,Range 5 East. <br /> Existing Conditions <br /> The existing conditions are a grass lawn bordered by 100th Place SE on,the north;a drainage <br /> ditch and two existing buildings on the west and south,respectively; and the asphalt access road <br /> to the existing buildings limits the site on the east. <br /> i The topography of the site is mostly flat with gentle slopes on the edges. Stormwater runoff can <br /> P: drain to the east,north,and west. Some of'the storm runoff in the east area of the site is collected <br /> into a small swale along 100th Place SE. The swale slopes from the east to the northwest and <br /> joinsthe drainage ditch at the northwest corner of the property. Off-site runoff also enters the <br /> swale. Most of this runoff cons from the road surface of 100th Place SE. <br /> The site consists of 0.74 acres of pervious area. It is mostly grass lawn with some landscape area <br /> and some small trees.The General Soil Map in the Soil Survey of Snohomish County indicates <br /> that the soil in the area is Alderwood. This soil is classified as a Hydrologic Soil Group C. A <br /> I curve number(CN)of 86 was used in the runoff calculation. <br /> {; The existing topographic survey was used to determine the flow route,as noted in Appendix A. <br /> Developed Conditions <br /> The developed conditions include a 3,400 square foot building along with 1,500 square feet of <br /> sidewalks and parking areas. In addition, 1,600 square feet of sidewalk will be provided along <br /> 10h Place SE. The developed conditions will consist of 0.59 acres of pervious landscape area <br /> and 0.15 acres of impervious areas. A CN of 86 was used for the landscape area,and a CN of 98 <br /> was used for the paved area. <br /> 1111 <br /> boot Coontry Nov*allw 2001 <br /> tlrarrlks Report -1- Reid iddleton <br />
The URL can be used to link to this page
Your browser does not support the video tag.