The off-site street runoff will be collected into a catch basin and pipe storm sewer system. The <br /> system runs parallel along 100th Place SE and daylights into the drainage ditch. The on-site <br /> runoff will be detained in an underground detention pipe before discharging off site into the new <br /> storm system along the 100th Place SE. <br /> The detention system was si to detain the stormwater runoff from the new impervious area of <br /> 6,500 square feet. For simplifying the drainage system,runcff from an equivalent existing paved <br /> area was collected into the detention system to substitute the 1,600 square foot sidewalks along <br /> 100th Place SE(see Appendix B). <br /> . . <br /> Detention Pipe Design Criteria <br /> The following stormwater detention design criteria will apply to this project: <br /> • Limit peak flows of the 2-year developed 24-hour design storm to 50 percent of the <br /> release rate of the 2-year existing 24-hour design storm. <br /> • Limit peak flows of the 10-year developed 24-hour design storm to the release rate of the <br /> 10-year existing 24-hour design storm. <br /> • Limit peak flows of the 100-year developed 24-hour design storm to the release rate of <br /> 1 the 1011-year existing 24-hour design storm. <br /> As outlined in the City of Everett Stormwater Management Manual,to account for back-to-back <br /> storm events and drainage modeling inaccuracies,the calculated detention volume was increased <br /> by a factor of 30 percent(see Appendix C). <br /> •. Summary <br /> . _. <br /> The following table of rainfall depths is for the 2-year, 10-year,and 100-year,24-hour design <br /> storms in the City of Everett based on Table 1-5.4 in the City of Everett Stormwater Management <br /> Manual: <br /> Design Storm Rainfall Depth(inchesi <br /> 2-year,24-hour 1.55 <br /> 10-year,24-hour 2.25 <br /> 100-year,24-hour 3.25 le <br /> Enter Csontry Etirptirs Nevieisor 20*1 <br /> Hydramiks Repot -2- Reid"9itlt16eton <br />