My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1127 OLYMPIC BLVD 2024-03-27
>
Address Records
>
OLYMPIC BLVD
>
1127
>
1127 OLYMPIC BLVD 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 10:20:05 AM
Creation date
3/16/2024 10:58:57 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
1127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and be collected in a drainage pipe installed within and around the <br /> perimeter of the play area. The drainage pipe will be connected to the <br /> existing drainage system outside of the play area. See Attachment A and <br /> B. <br /> 3. The existing outfall for the playground is in the Glenhaven Creek <br /> drainage ravine. A quarry spall rock apron will be constructed at the <br /> outfall to dissipate any flow from the drainage pipe. <br /> Minimum Requirements <br /> The Small Project Site Plan/Report form(Attachment D) was prepared to show <br /> compliance Minimum Requirements #1-5. The following highlights key <br /> information from the form. <br /> Minimum Requirement#2—Construction Stormwater Pollution Prevention Plan <br /> SWPPP Parks will be responsible for preventing erosion and sedimentation <br /> during construction, including these activities: <br /> • Minimize construction track-out. BMP C105: Stabilize construction <br /> entrance/exit. <br /> • Construction staging and play equipment stockpiling will be located in the <br /> adjacent parking lot and outside sensitive areas. <br /> • BMP C233 will be used to protect slopes to the east. <br /> • BMP C220 and C209 will be used for catch basin inlet protection and the <br /> existing drain line leaving the playground area. <br /> • BMP C151 and BMP C154 will be used for concrete handling concrete <br /> and washout activities. <br /> • Any materials needed for erosion prevention and sedimentation control <br /> will be kept at the project site (BMP C150). <br /> • Construction sequencing will be done in a manner that reduces the amount and <br /> duration of soil exposed to erosion by wind,rain,runoff, and vehicle tracking <br /> (BMP C162). <br /> Minimum Requirement#3 — Source Control BMPs <br /> Parks must apply these Source Control BMPs to the project site: <br /> • Section V-1 Source Control BMPs Applicable to All Sites (e.g., good <br /> housekeeping, employee training, inspections, recordkeeping, etc. which <br /> are a part of Parks' normal operations) <br /> • S411 BMPs for Vegetation Management(which are a part of Parks' <br /> normal operations) <br /> • BMP 5421 for parking and storage of vehicles and equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.