My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8625 3RD AVE SE 2024-03-27
>
Address Records
>
3RD AVE SE
>
8625
>
8625 3RD AVE SE 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 10:31:26 AM
Creation date
3/16/2024 11:18:26 AM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
8625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02370 <br /> EROSION CONTROL <br /> PART1 GENERAL <br /> 1.1 SCOPE <br /> The work specified in this Section includes the temporary erosion and <br /> sedimentation control (TESC) in and around the site caused by the actions of the <br /> Contractor as shown on the Plans and as specified herein. <br /> Work under this Section shall be directed towards site areas disturbed during <br /> construction as well as all off-site storage and parking areas maintained by the <br /> Contractor. <br /> 1.2 RELATED WORK SPECIFIED ELSEWHERE <br /> Section Item <br /> 01160 Regulatory Requirements <br /> 01200 Measurement and Payment <br /> 01300 Submittals <br /> 02240 Dewatering <br /> 02300 Earthwork <br /> 1.3 CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) <br /> The Contractor shall designate a Certified Erosion and Sediment Control Lead <br /> (CESCL) for this project. The CESCL shall have, for the life of this Contract, a <br /> current Certificate of Training in Construction Site Erosion and Spill Control. <br /> Duties of the CESCL shall include, but are not limited to: <br /> A. Inspecting temporary erosion and spill control Best Management Practice <br /> (BMPs) for proper location, installation, maintenance, and repair. <br /> Inspections shall be made as noted on the Plans and after each significant <br /> precipitation event, including those that occur during weekends and after <br /> working hours. A Temporary Erosion and Spill Control Inspection Report <br /> shall be prepared for each inspection and shall be included in the <br /> Temporary Erosion and Spill Control file. The inspection report shall <br /> include,but not be limited to: <br /> 1. When BMPs are installed, removed or changed; <br /> 2. Repairs needed or made; ` City of Everett <br /> EVERETT Reviewed for Permit 12/30/2021 <br /> AWWD Project W1609 Erosion Control <br /> Winter 2021 02370-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.