My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8625 3RD AVE SE 2024-03-27
>
Address Records
>
3RD AVE SE
>
8625
>
8625 3RD AVE SE 2024-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 10:31:26 AM
Creation date
3/16/2024 11:18:26 AM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
8625
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Turbidity monitoring results; <br /> 4. Observations of BMP effectiveness and proper placement; <br /> 5. Recommendations for improving performance of BMPs. <br /> B. Prepare and maintain a Temporary Erosion and Spill Control file on site <br /> that includes but is not limited to: <br /> 1. Temporary Erosion and Spill Control Inspection Reports; <br /> 2. Contractor's Stormwater Pollution Prevention Plan(SWPPP); <br /> 3. Spill Prevention, Control, and Countermeasures (SPCC) Plan; <br /> 4. All project permits, including but not limited to grading permits <br /> and Hydraulics Project Approval; <br /> 5. Manufacturer instructions for all products used for TESC BMPs; <br /> 6. Washington State Department of Ecology's Stormwater <br /> Management Manual for Western Washington, Chapter 4, Volume <br /> II, current edition. <br /> 1.4 STORMWATER POLLUTION PREVENTION PLAN <br /> The CESCL Contractor shall be responsible for preparing a Stormwater Pollution <br /> Prevention Plan (SWPPP). The intent of the SWPPP is to reflect the Contractor's <br /> operations by supplementing the TESC Drawings, details, and notes shown on the <br /> Plans to provide comprehensive pollution control at the construction sites, staging <br /> areas, stockpiles, and borrow sites. The SWPPP shall be prepared by the CESCL <br /> for the project and submittal in accordance with Section 01300. The SWPPP shall <br /> be submitted to City of Everett, Snohomish County or other applicable <br /> jurisdictions for review. No work shall begin until the Contractor's SWPPP, <br /> as approved by permitting agency, is implemented. The SWPPP shall address, <br /> at least, the following items: <br /> • Identification of construction haul routes and location of BMPs such as <br /> storm drain inlet protection or other measures necessary to meet NPDES <br /> requirements. <br /> • Waste disposal methods and locations. <br /> City of Everett <br /> EVERETT Reviewed for Permit 12/30/2021 <br /> AWWD Project W1609 Erosion Control <br /> Winter 2021 02370-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.