Laserfiche WebLink
EVERETT <br />WASHINGTON <br />PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />3200 Cedar Street, 2"d Floor <br />Everett, WA 98201 <br />425-257-8810 <br />Date Applied: 1/6/2022 <br />Public Works Permit #: PW2201-004 <br />Associated Bldg Permit #: <br />Planning Reference #: <br />Public Works Fee: $65.00 <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />BROOKTRAUT PROPERTIES LLC <br />Dwayne Hopper <br />PO BOX 1447 <br />11709 Cyrus Way <br />EVERETT, WA, 98206 <br />Mukilteo, WA, 98275 <br />PHONE: <br />PHONE: 42S34713SS <br />TAX PARCEL ID #: 00439168001500 <br />SITE ADDRESS: 2931 GRAND AVE <br />DESCRIPTION: INSTALL CHAINLINK FENCE W/ AUTOMATED GATE <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. The fence shall be no greater than 3'-6" (42") in height within the front setback or the abutting right-of-way (shortest property frontage, <br />unless otherwise noted or previously determined). <br />5. The fence shall be no greater than 6 feet in height within the street side setback or the abutting right-of-way. <br />6. Fence height, material and location shall comply with all standards set forth in EMC 19.40. <br />7. Protect all existing underground utilities during construction. Fence posts shall be at least 2ft away from any underground utility. Water <br />meters shall remain outside of fenced areas to be kept clear and accessible for maintenance and monthly meter reading. <br />8. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />9. Any fence constructed within the public right -of -way must be removed or relocated at the owner's expense if the City ever requires use of <br />the right-of-way for municipal purposes. <br />10. The owner/applicant is responsible for establishing the center of the alley way. <br />11. This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit Close <br />Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />Public Works Permit Fee Breakdown: <br />Misc. Minor Work (Fencing and Gate) ............ $25.00 <br />PW Plan Review ............................................... $20.00 <br />PW Site Inspection .......................................... $20.00 <br />City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant <br />hereby agrees to hold and save harmless the City of Everett from any <br />and all claims for damages, costs, expenses, or causes of action that <br />may arise because of installation and maintenance the <br />improvement or other right-of-way use here to applied for and further <br />03/03/2022 agrees to remove same upon notice from the City and to replace <br />Approved for Construction, Public Works Dept. Date public property damaged thereby. <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BEDILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE <br />CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />—APPLICANT/JOB SITE COPY _TREASURER _ADDRESS FILE <br />