My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pace Engineers, Inc. 4/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pace Engineers, Inc. 4/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:36:42 AM
Creation date
4/3/2024 9:44:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pace Engineers, Inc.
Approval Date
4/1/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Vincent Bruscas/Sabina Araya
Subject / Project Title
Everett Mall Bus Station Platform
Tracking Number
0004278
Total Compensation
$262,552.25
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers Inc. 2/16/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Services Agreements
PACE Engineers Inc. 8/22/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 7 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br /> All field explorations conducted through the pavement will be patched with <br />aquaphalt. Saw cutting of the pavement or hot mix asphalt patches will not be <br />completed. <br /> One round of review of the Geotechnical and Pavement Engineering Report will be <br />required. <br /> Following delivery of the draft report, all soil samples will be disposed of, unless <br />otherwise mutually agreed upon. Long-term storage of soil samples by HWA is not <br />included. <br />DELIVERABLES <br /> Geotechnical Subsurface Exploration Plan (PDF) <br /> Draft Preliminary Geotechnical Engineering Report (PDF) <br /> Preliminary Geotechnical Engineering Report (PDF) <br />Client Responsibilities <br /> Provide access to the site to perform site reconnaissance, utility locates, and <br />pavement coring. <br /> Provide necessary permits and rights of entry at no cost to HWA <br />4. Conceptual Design <br />The extent of the conceptual design task to develop two to four transit center schematic <br />site options, gain City and mall developer input and create one preferred site plan. <br /> Prepare two to four site options. <br /> Prepare one preferred site plan. <br />Site layout options will be sketched on aerial based GIS files. Formal CAD files will not be <br />prepared until the 60% design phase. <br />5. Mall Coordination <br />Hold up to four (4) virtual meetings with the Mall Developer to gain transit center <br />relocation and design consensus. <br />6. Restroom Building Coordination <br />Hold up to four (4) virtual meetings to review design needs and procurement of the project <br />restroom building. Public Restroom Company seems to provide a modular design that <br />addresses Everett Transit needs.
The URL can be used to link to this page
Your browser does not support the video tag.