My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pace Engineers, Inc. 4/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pace Engineers, Inc. 4/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:36:42 AM
Creation date
4/3/2024 9:44:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pace Engineers, Inc.
Approval Date
4/1/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Vincent Bruscas/Sabina Araya
Subject / Project Title
Everett Mall Bus Station Platform
Tracking Number
0004278
Total Compensation
$262,552.25
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers Inc. 2/16/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Services Agreements
PACE Engineers Inc. 8/22/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 6 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br /> A description of all laboratory tests conducted and the test results, as well <br />as any previous geotechnical laboratory test results that are relevant for the <br />project. <br /> A site plan showing pavement core locations and other pertinent features. <br /> Respond to Review comments: HWA will respond to review comments in the <br />form of emails to the design team. <br /> Final Geotechnical Engineering Report: The report will be finalized after <br />comments from the City and design team are received. <br />ASSUMPTIONS/CONDITIONS <br />The following assumptions were made as part of the development of this scope of work: <br /> All exploration locations will be within City of Everett’s rights-of-way or private <br />property for which rights of entry have been previously secured. All required <br />permits will be provided by the City. <br /> Pavement coring will be accomplished during normal daylight workdays and hours, <br />with at least a minimum of 8 hours available per day for on-street work. Coring is <br />estimated to be completed within 1 day. <br /> Glacial till soils are anticipated at the site, which is a NRCS type D soil; therefore, <br />field testing to evaluate stormwater infiltration should not be required. No PITs or <br />EPA falling head (percolation) tests will be completed as part of this scope of work. <br /> Glacial till soils are anticipated at the site, which would likely provide enough <br />lateral capacity for use of WSDOT’s standard luminaire foundation design and for <br />shallow foundations or a gravel pad to support the proposed improvements. <br /> Traffic control such as flaggers, arrow boards, or other similar equipment will not <br />be required. Work zones are anticipated to be located within parking stalls or <br />landscape islands of the existing parking lot and can be delineated with traffic <br />cones. <br /> Utility locates will be comprehensive and accurate enough to allow reliable and <br />safe location of pavement cores. Vacuum extraction at the pavement cores is not <br />included. <br /> Coring locations will be field located using handheld GPS and measurement from <br />existing known features. Surveying of actual exploration locations is not included. <br /> The geotechnical explorations proposed herein will not be used to assess site <br />environmental conditions. However, visual or olfactory observations regarding <br />potential contamination will be noted. Analysis, testing, storage, and handling of <br />potentially contaminated soil and ground water (either sampled or spoils from <br />drilling) are beyond this scope of services. If contaminated soils and/or ground <br />water are encountered, the material will be properly contained on-site for disposal <br />as mutually agreed upon without additional cost to HWA.
The URL can be used to link to this page
Your browser does not support the video tag.