My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pace Engineers, Inc. 4/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pace Engineers, Inc. 4/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:36:42 AM
Creation date
4/3/2024 9:44:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pace Engineers, Inc.
Approval Date
4/1/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Vincent Bruscas/Sabina Araya
Subject / Project Title
Everett Mall Bus Station Platform
Tracking Number
0004278
Total Compensation
$262,552.25
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers Inc. 2/16/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Services Agreements
PACE Engineers Inc. 8/22/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 9 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br />Signage, Striping, and Site Amenities <br />Identify striping, traffic signage, and site features necessary for the operation of the park and <br />ride facility. Signage will be limited to standard signage available in the MUTCD or other <br />sources, except for the site monument signs. Design of site identification signs, bus route <br />flags and other transit specific signage will be provided by Everett Transit. <br />Survey Control and Horizontal Control Plan <br />Identify the locations and dimensions of proposed site features in a manner that allows the <br />contractor to correctly locate the facilities. Location information will be a combination of <br />coordinates, Station/Offset callouts and measured dimensions as best conveys the intent of <br />the design. The Survey Control Plan will be prepared by an engineer based on previously <br />completed site survey. It will not be a boundary survey or recordable survey document. <br />Opinion of Probabl e Construction Cost <br />Prepare an opinion of the probable construction cost for the project based on the 60% design <br />plans. The opinion will capture all significant project costs to the extent known and provide <br />sufficient contingency to gauge the final cost of the project. <br />Specifications <br />Specifications will be prepared in WSDOT/ APWA format for the project. The 60% <br />specifications will address significant design elements but will leave some details for later <br />completion. Bid forms will not be prepared at the 60% level. <br />Document Assembly <br />Assemble all deliverables from team members into a cohesive package for delivery to Everett <br />Transit. <br />A maximum of twenty (20) civil plans will be prepared. Most plan sheets will be scaled at 1" = <br />20' for full size drawings (22" x 34") and 1" = 40' for half size drawings (11" x 17"). This scale <br />allows the most efficient breakdown of the site while providing sufficient detail to convey the <br />design intent. The anticipated plans are as follows: <br /> Cover (1 plan sheet) <br /> Legend and Abbreviations (1 plan sheet) <br /> Site Plan (1 plan sheet) <br /> Horizontal Control Plan (1 plan sheet) <br /> Survey Control Plan (1 plan sheet) <br /> Site Preparation and Erosion Control (1 plan sheet) <br /> Site Preparation and Erosion Control Details (1 sheet) <br /> Grading Plan (2 plan sheets)
The URL can be used to link to this page
Your browser does not support the video tag.