My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pace Engineers, Inc. 4/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pace Engineers, Inc. 4/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:36:42 AM
Creation date
4/3/2024 9:44:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pace Engineers, Inc.
Approval Date
4/1/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Vincent Bruscas/Sabina Araya
Subject / Project Title
Everett Mall Bus Station Platform
Tracking Number
0004278
Total Compensation
$262,552.25
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers Inc. 2/16/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Services Agreements
PACE Engineers Inc. 8/22/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 10 of 16 <br /> <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br /> Grading Details and Sections (1 plan sheet) <br /> Drainage Plan (2 plan sheets) <br /> Drainage Details and Facility Plans (1 sheet) <br /> Utility Plan (1 plan sheet) <br /> Paving, Signage and Channelization Plan (2 plan sheets) <br /> Paving, Signage and Channelization Details (1 plan sheet) <br /> Restroom Building Utility Connection (1 plan sheet) <br /> Illumination Plans (2 plan sheets) <br />In addition, plans by other disciplines will be prepared at 60% as described herein. <br />Assumptions: <br />• The project configuration selected in conceptual plan development phase will not be <br />substantially revised during the course of the design efforts. <br />• Design will be in accordance with City of Everett Development Standards. <br />• No additional water and sewer work will be required except for service lines as described <br />herein. No utility main extensions will be provided. <br />• Specifications will be in WSDOT/APWA format. <br />• Everett Transit will provide boilerplate contract language to be included with the <br />specifications. <br />• A project opinion of cost will be prepared in PACE standard format. <br />• There are no sensitive or contaminated areas on site. <br />• A maximum of twenty-two civil plan sheets will be prepared. <br />• Color rendering graphics will not be produced under this task. <br />Deliverables: <br />• 60% Plans (PDF) <br />• 60% Opinion of Cost (PDF) <br />• 60% Specifications (PDF) <br />8. Stormwater Analysis <br />The intent of this task is to prepare a draft and final stormwater analysis report. <br />Drainage Design <br /> Early on we will provide a conceptual design for the stormwater based on the site <br />layout and the geotechnical engineering report (prepared by others) <br /> Provide onsite stormwater conveyance, flow control mitigation, water quality <br />treatment facilities and LID design for the project site in accordance with agency <br />requirements.
The URL can be used to link to this page
Your browser does not support the video tag.