My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pace Engineers, Inc. 4/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pace Engineers, Inc. 4/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 9:36:42 AM
Creation date
4/3/2024 9:44:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pace Engineers, Inc.
Approval Date
4/1/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Transportation Services
Department Project Manager
Vincent Bruscas/Sabina Araya
Subject / Project Title
Everett Mall Bus Station Platform
Tracking Number
0004278
Total Compensation
$262,552.25
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
PACE Engineers Inc. 2/16/2025 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Services Agreements
PACE Engineers Inc. 8/22/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 8, 2024 <br />Vincent Bruscas <br />City of Everett <br />Everett Mall Bus Platform <br />Page 16 of 16 <br />P:\KIR\P24\_2024 PROPOSALS\ENGINEERING\P24-046 Everett Mall Bus Platform\Everett Bus Platform Scope.docx <br />GENERAL ASSUMPTIONS <br />•City will secure all rights of entry <br />•30% Civil Plans or Estimates will not be prepared <br />•Wetland delineations and buffer reviews are excluded from this Scope of Services <br />•Traffic analysis is excluded and will not be prepared <br />•Cultural resource investigation is excluded and will not be prepared <br />•All other permits and regulatory approvals not specifically identified in this Scope will be <br />secured by others. <br />•Property encumbrance exhibit will be prepared by others (Mall Surveyor) <br />•If required, stormwater detention vault sizing and control structure will be specified. <br />Structural vault design will be a deferred submittal that low bid contractor will be <br />required to prepare. <br />•Existing transit center will be demolished/removed by others. <br />•Civil design and design support is limited to the area at Everett Mall, depicted by the <br />graphics presented under the project understanding. Off-site improvements outside of <br />that view are excluded. <br />•Construction management and inspection services are excluded at this time and have <br />not been budgeted for. <br />•Standard Everett Transit shelters will be incorporated into the project. Shelter design is <br />excluded from this project. <br />•City to provide title reports to the consultant. <br />•Utilities are readily available, located within 100 LF of the site. <br />PROJECT SCHEDULE <br />The project will be fully designed in four months from notice to proceed, with the assumption that <br />timely revisions and decisions will be made by the City. Everett Transit is responsible for <br />coordinating other City Department reviews of plans and permit applications. <br />OWNER PROVIDED MATERIAL <br />•Site Right-of-Entry <br />•Standard Bus Shelter Plans & Specifications <br />•Transit Bay Flag Plan & Specifications
The URL can be used to link to this page
Your browser does not support the video tag.