Laserfiche WebLink
2 <br /> <br />requirement that each Project contractor sign a City- <br />provided contract addendum, the form of which has <br />been given to the Arboretum Society. <br />B. Clarifications regarding certain Project work: <br />(1) Pathway renovation from Small Tree Walk <br />through the conifer and woodland gardens, will <br />include lifting old bender board edging, replacing <br />missing sections, adding and compacting 1/4 <br />minus gravel to the pathway surface, and making <br />three shortcuts from the parking lot into the Small <br />Tree Walk. <br />(2) Soil addition to the Backyard Garden area will use <br />approximately 80 cubic yards delivered to site, <br />rototilled into existing soil, and raked and rolled <br />to provide a firm base. <br />3. Miscellaneous. All provisions in the MOU shall remain in effect <br />except as expressly modified by this MOU. This MOU is signed by <br />the parties with AdobeSign, which is fully binding. <br />[signatures on following page(s)] <br />