Laserfiche WebLink
Consultant Fee Determination <br />Forest Park Pickleball Court Improvements <br />February 2024 <br />PC PM PD DR AD SUBTOTAL <br />Task SCOPE OF WORK $60.00 $48.00 $39.00 $37.00 $41.00 <br />1.0 <br />1.1 Project Coordination 2 8 $504.00 <br />1.2 Check-In Meetings 12 12 $1,296.00 <br />1.3 Document Management 4 5 $377.00 <br />1.4 Project Schedule 2 $120.00 <br />1.5 Subconsultant Management 2 8 $504.00 <br />1.6 Quality Assurance / Quality Control 4 $240.00 <br />1.7 Invoicing 5 9 $609.00 <br />Subtotal:22 37 0 5 9 $3,650.00 <br />2.0 <br />2.1 Survey and Mapping 2 8 4 $652.00 <br />2.2 Site Reconnaissance and Document Search 3 6 $468.00 <br />Subtotal:5 14 0 4 0 $1,120.00 <br />3.0 <br />3.1 Document Review 1 $60.00 <br />3.2 Site Visit $0.00 <br />3.3 Site Investigation 2 $96.00 <br />3.4 Technical Support 2 1 $168.00 <br />3.5 Report 2 2 $216.00 <br />3.6 Document Review and Comment 1 2 2 $230.00 <br />Subtotal:67020 $770.00 <br />4.0 <br />4.1 Document Review $0.00 <br />4.2 Permit Application Support $0.00 <br />Subtotal:00000 $0.00 <br />5.0 <br />5.1 Alternative Concept Plans $0.00 <br />5.2 Evaluation and Review $0.00 <br />Subtotal:00000 $0.00 <br />6.0 <br />6.1 Prepare Plan Set 1 8 6 $666.00 <br />Survey 1 2 $122.00 <br />Demolition Plan 1 2 2 $230.00 <br />TESC Plan 1 $37.00 <br />Layout Plans 2 12 6 $918.00 <br />Grading Plan 2 8 6 $726.00 <br />Planting Plan 1484 $712.00 <br />Site Construction Details 2 6 8 $704.00 <br />Non-Structural Wall Plan and Details 2 8 4 $652.00 <br />Stormwater Plan 2 4 2 $386.00 <br />Utility Plan 1 2 1 $193.00 <br />Electrical Plan 1 2 1 $193.00 <br />Lighting Plan 2 4 2 $386.00 <br />6.2 Documents and Reports 2 1 $168.00 <br />6.3 Cost Opinion 2884 $964.00 <br />6.4 Specification Outline 1 2 $156.00 <br />Subtotal:22 72 16 49 0 $7,213.00 <br />7.0 <br />7.1 Advance Plan Set 1 12 8 $932.00 <br />Survey 1 1 $85.00 <br />Demolition Plan 1 2 2 $230.00 <br />TESC Plan 1 $37.00 <br />Layout Plans 2 12 8 $992.00 <br />Grading Plan 2 8 8 $800.00 <br />Planting Plan 1484 $712.00 <br />Site Construction Details 2 8 12 $948.00 <br />MacLeod Reckord <br />PROJECT ADMINISTRATION AND MANAGEMENT <br />SITE RECONNAISSANCE <br />GEOTECHNICAL EVALUATION AND REPORTING <br />ENVIRONMENTAL ASSESSMENT AND REPORTING <br />60% DESIGN DEVELOPMENT <br />90% CONSTRUCTION DOCUMENTS <br />CONCEPT ALTERNATIVES EVALUATION <br />Page 2 of 6