My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Municipal Building - TI <br />ATTACHMENT D - DOCUMENT LIST <br />BID PACKAGE MANUAL <br />FORM OF CONTRACT <br />00 52 00 <br />E4.06 SIXTH FLOOR - SYSTEMS PLAN 11/6/2023 12/6/2023 <br />E4.07 SEVENTH FLOOR - SYSTEMS PLAN 11/6/2023 12/6/2023 12/8/2023 <br />E4.08 EIGHTH FLOOR - SYSTEMS PLAN 11/6/2023 12/6/2023 <br />E4.09 NINTH FLOOR - SYSTEMS PLAN 11/6/2023 12/6/2023 <br />E4.10 TENTH FLOOR - SYSTEMS PLAN 11/6/2023 12/6/2023 <br />E4.11 PENTHOUSE - SYSTEMS PLAN 11/6/2023 12/6/2023 <br />E4.30 ENLARGED POWER PLANS 11/6/2023 <br />E4.40 ENLARGED SYSTEMS PLANS 11/6/2023 <br />E5.01 ELECTRICAL DETAILS 11/6/2023 <br />E6.01 ELECTRICAL ONE-LINE DIAGRAM 11/6/2023 11/30/2023 12/6/2023 <br />E6.02 ELECTRICAL ONE-LINE DIAGRAM 11/6/2023 11/30/2023 12/6/2023 <br />E6.10 ELECTRICAL LOAD CALCULATION 12/8/2023 <br />E6.11 ELECTRICAL PANEL SCHEDULES 1 11/6/2023 11/30/2023 12/6/2023 <br />E6.12 ELECTRICAL PANEL SCHEDULES 2 11/6/2023 11/30/2023 12/6/2023 <br />E6.13 ELECTRICAL PANEL SCHEDULES 3 11/6/2023 11/30/2023 <br />E6.14 ELECTRICAL PANEL SCHEDULES 4 11/6/2023 11/30/2023 <br />E6.15 ELECTRICAL PANEL SCHEDULES 5 11/6/2023 11/30/2023 <br />E6.16 ELECTRICAL PANEL SCHEDULES 6 11/6/2023 11/30/2023 <br />E6.17 ELECTRICAL PANEL SCHEDULES 7 11/6/2023 11/30/2023 <br />E6.18 ELECTRICAL PANEL SCHEDULES 8 11/6/2023 11/30/2023 <br />E6.19 ELECTRICAL PANEL SCHEDULES 9 11/6/2023 11/30/2023 <br />E6.20 ELECTRICAL PANEL SCHEDULES 10 11/6/2023 11/30/2023 <br />E6.21 ELECTRICAL PANEL SCHEDULES 11 11/6/2023 11/30/2023 <br />E6.22 ELECTRICAL PANEL SCHEDULES 12 11/6/2023 11/30/2023 <br />E6.23 ELECTRICAL PANEL SCHEDULES 13 11/6/2023 11/30/2023 <br />E6.24 ELECTRICAL PANEL SCHEDULES 14 11/6/2023 11/30/2023 12/6/2023 <br />E6.25 ELECTRICAL PANEL SCHEDULES 15 11/6/2023 11/30/2023 12/6/2023 <br />E6.26 ELECTRICAL PANEL SCHEDULES 16 11/6/2023 11/30/2023 <br />E6.27 ELECTRICAL PANEL SCHEDULES 17 11/6/2023 11/30/2023 <br />E6.28 ELECTRICAL PANEL SCHEDULES 18 11/6/2023 11/30/2023 <br />E6.29 ELECTRICAL PANEL SCHEDULES 19 11/6/2023 11/30/2023 <br />E6.30 ELECTRICAL PANEL SCHEDULES 20 11/6/2023 11/30/2023 <br />E6.31 ELECTRICAL PANEL SCHEDULES 21 11/6/2023 11/30/2023 12/6/2023 <br />E6.32 ELECTRICAL PANEL SCHEDULES 22 11/30/2023 <br />E7.01 SYSTEMS DETAILS I 11/6/2023 <br />E7.02 SYSTEMS DETAILS II 11/6/2023 <br />E7.03 SYSTEMS DETAILS III 11/6/2023 <br />E7.04 SYSTEMS DETAILS IV 11/6/2023 <br />FIRE ALARM <br />FA0.01 FIRE ALARM / EMERGENCY COMMUNICATION LEGEND AND NOTES 11/6/2023 <br />FA0.02 FIRE ALARM / EMERGENCY COMMUNICATION RISER DIAGRAM AND NOTES 11/6/2023 <br />FA1.00 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - GARAG PLAN 11/6/2023 <br />FA1.01 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - FIRST FLOOR PLAN 11/6/2023 <br />FA1.02 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - SECOND FLOOR PLAN 11/6/2023 <br />FA1.03 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - THIRD FLOOR PLAN 11/6/2023 <br />FA1.04 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - FOURTH FLOOR PLAN 11/6/2023 <br />FA1.05 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - FIFTH FLOOR PLAN 11/6/2023 <br />FA1.06 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - SIXTH FLOOR PLAN 11/6/2023 <br />FA1.07 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - SEVENT FLOOR PLAN 11/6/2023 <br />FA1.08 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - EIGHTH FLOOR PLAN 11/6/2023 <br />FA1.09 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - NINTH FLOOR PLAN 11/6/2023 <br />FA1.10 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - TENTH FLOOR PLAN 11/6/2023 <br />FA1.11 FIRE ALARM / EMERGENCY COMMUNICATION SYSTEM - ROOF PLAN 11/6/2023 <br />FIRE PROTECTION <br />FX1.01 FIRE PROTECTION FIRST FLOOR PLAN 11/6/2023 <br />FX1.02 FIRE PROTECTION SECOND FLOOR PLAN 11/6/2023 <br />FX1.03 FIRE PROTECTION THIRD FLOOR PLAN 11/6/2023 <br />FX1.04 FIRE PROTECTION FOURTH FLOOR PLAN 11/6/2023 <br />FX1.05 FIRE PROTECTION FIFTH FLOOR PLAN 11/6/2023 <br />FX1.06 FIRE PROTECTION SIXTH FLOOR PLAN 11/6/2023 <br />FX1.07 FIRE PROTECTION SEVENTH FLOOR PLAN 11/6/2023 <br />FX1.08 FIRE PROTECTION EIGHTH FLOOR PLAN 11/6/2023 <br />FX1.09 FIRE PROTECTION NINTH FLOOR PLAN 11/6/2023 <br />FX1.10 FIRE PROTECTION TENTH FLOOR PLAN 11/6/2023 <br />SPECIFICATIONS <br />SECTION NUMBER DESCRIPTION DATE <br />DIVISION 00 <br />00 01 07 Seals Page 11/30/2023 <br />00 01 10 Table of Contents 11/30/2023 <br />00 50 00 Contracting Forms and Supplements - GCCM Agreement 2/3/2023 <br />00 50 01.1 GMP Amendment - AIA A133 Exhibit A-2019 2/3/2023 <br />00 50 02 Cost Responsibility Matrix 2/3/2023 <br />00 50 02.1 Attachment No. 1 - Cost Responsibility Matrix 2/3/2023 <br />00 50 03 Attachment No. 2 - Form of Construction Cost Estimate 2/3/2023 <br />00 50 04 Attachment No. 3 - Form of Cost Summary 2/3/2023 <br />00 50 05 Attachment No. 4 - Form of Contract Documents 2/3/2023 <br />00 50 06 Attachment No. 5 - List of Negotiated Support Services 2/3/2023 <br />00 50 07 Attachment A1 - Scope of Work for Preconstruction Services 2/3/2023 <br />00 50 08 GCCM Preconstruction Work Plan 2/3/2023 <br />00 50 08.1 Attachment A2 - GCCM Preconstruction Work Plan 2/3/2023 <br />00 50 09 Attachment B - Insurance Requirements 2/3/2023 <br />00 50 10 Attachment C - Prevailing Wage Rate Information 2/3/2023 <br />00 68 00 Apprentice Utilization Reporting 2/3/2023 <br />00 72 00 General Conditions of the Contract for Construction 2/3/2023 <br />DIVISION 01 <br />01 11 00 Summary of Work 2/3/2023 <br />01 25 00 Substitutions 2/3/2023 <br />01 26 00 Construction Change Directive AIA Document G714 - 2017 2/3/2023 <br />01 26 00 Change Order AIA Document G714-2017 2/3/2023 <br />01 26 00 Contract Modificatoins 2/3/2023 <br />01 26 00 PR GCCM Summary 2/3/2023 <br />01 26 00 PR Sub Summary 2/3/2023 <br />01 29 76 Application Certification of Payment AIA G702-1992 2/3/2023 <br />01 29 76 Certificate of Payment of Labor and Materials 2/3/2023 <br />01 29 76 Monthly Subcontractor List and Certificatons 2/3/2023 <br />PAGE: 4 of 6
The URL can be used to link to this page
Your browser does not support the video tag.