My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Municipal Building - TI <br />ATTACHMENT D - DOCUMENT LIST <br />BID PACKAGE MANUAL <br />FORM OF CONTRACT <br />00 52 00 <br />01 29 76 Progress Payments_GCCM 2/3/2023 <br />01 29 76 Retainage Bond 2/3/2023 <br />01 29 76 Retainage Escrow Agreement 2/3/2023 <br />01 29 76 Schedule of Values 2/3/2023 <br />01 29 76 Statement of Intent to Pay Prevailing Wages 2/3/2023 <br />01 31 00 Architect's Supplemental Instructions AIA G710-2017 2/3/2023 <br />01 31 00 Everett Request for Information 2/3/2023 <br />01 31 00 Project Management Coordination 2/3/2023 <br />01 31 19 Project Meetings 2/3/2023 <br />01 32 16 Construction Progress Schedule 2/3/2023 <br />01 32 16 Short Interval Schedule 2/3/2023 <br />01 32 16.1 Sample Pages_OAC 2/3/2023 <br />01 33 00 Electronic Data Release 2/3/2023 <br />01 33 00 Submittal Procedures_GCCM 2/3/2023 <br />01 35 23 Safety Requirements_GCCM 2/3/2023 <br />01 42 00 References 2/3/2023 <br />01 45 00 Contractor Quality Control Daily Report 2/3/2023 <br />01 45 00 Contractor Quality Control 2/3/2023 <br />01 45 23 Testing and Inspection_GCCM 2/3/2023 <br />01 50 00 Temporary FACILITIES AND CONTROLS GCCM 2/3/2023 <br />01 50 00 Utility Shutdown Request 2/3/2023 <br />01 71 23 Field Engineering 2/3/2023 <br />01 73 39 Cutting and Patching_GCCM 2/3/2023 <br />01 74 00 Construction Waste Management 2/3/2023 <br />01 75 00 Test Engineer Services_GCCM 2/3/2023 <br />01 77 00 Asbestos-free Certification 2/3/2023 <br />01 77 00 Closeout Procedures 2/3/2023 <br />01 77 00 Lead-free Certification 2/3/2023 <br />01 78 36 Warranties 2/3/2023 <br />01 91 00 Commissioning 2/3/2023 <br />DIVISION 02 <br />02 41 00 Demolition 11/6/2023 <br />DIVISION 03 <br />03 30 00 Cast-in-Place Concrete 11/6/2023 <br />03 35 11 Concrete Floor Finishes 11/6/2023 <br />DIVISION 05 <br />05 12 00 Structural Steel Framing 11/6/2023 <br />05 40 00 Cold-Formed Metal Framing 11/6/2023 <br />05 50 00 Metal Fabrications 11/6/2023 <br />DIVISION 06 <br />06 10 00 Rough Carpentry 11/6/2023 <br />06 20 00 Finish Carpentry 11/6/2023 <br />06 41 00 Architectural Wood Casework 11/6/2023 11/30/2023 <br />06 83 16 Fiberglass Reinforced Paneling 11/6/2023 <br />DIVISION 07 <br />07 01 50.19 Preparation for Re-Roofing 11/6/2023 <br />07 21 00 Thermal Insulation 11/6/2023 11/30/2023 <br />07 26 00 Vapor Retarders 11/6/2023 <br />07 27 00 Air Barriers 11/6/2023 <br />07 52 00 Modified Bituminous Membrane Roofing 11/6/2023 11/30/2023 <br />07 62 00 Sheet Metal Flashing and Trim 11/6/2023 <br />07 72 00 Roof Accessories 11/6/2023 11/30/2023 <br />07 90 05 Joint Sealers 11/6/2023 <br />DIVISION 08 <br />08 11 13 Hollow Metal Doors and Frames 11/6/2023 <br />08 14 16 Flush Wood Doors 11/6/2023 12/6/2023 <br />08 43 13 Aluminum-Framed Storefronts 11/6/2023 <br />08 56 59 Service and Teller Window Units 11/6/2023 <br />08 71 00 Door Hardware 11/6/2023 <br />08 80 00 Glazing 11/6/2023 <br />DIVISION 09 <br />09 05 61 Common Work Results for Flooring Preparation 11/6/2023 <br />09 21 16 Gypsum Board Assemblies 11/6/2023 12/12/2023 <br />09 30 00 Tiling 11/6/2023 <br />09 51 00 Acoustical Ceilings 11/6/2023 12/6/2023 <br />09 54 26 Suspended Wood Ceilings 11/6/2023 <br />09 65 00 Resilient Flooring 11/6/2023 <br />09 68 13 Tile Carpeting 11/6/2023 <br />09 72 00 Wall Coverings 11/6/2023 <br />09 84 14 Acoustic Stretched-Fabric Wall and Ceiling Systems 11/6/2023 <br />09 84 30 Sound-Absorbing Wall and Ceiling Units 11/6/2023 <br />09 90 00 Painting and Coating 11/6/2023 11/30/2023 <br />09 93 00 Staining and Transparent Finishes 11/6/2023 11/30/2023 <br />DIVISION 10 <br />10 11 00 Visual Display Units 11/6/2023 <br />10 12 00 Display Cases 11/6/2023 <br />10 14 00 Signage 11/6/2023 <br />10 21 13.16 Plastic-Laminate-Clad Toilet Compartments 11/6/2023 <br />10 26 01 Wall and Corner Guards 11/6/2023 <br />10 28 00 TOILET ACCESSORIES 11/6/2023 <br />10 44 00 Fire Protection Specialties 11/6/2023 <br />10 82 13 Exterior Grilles and Screens 11/6/2023 <br />DIVISION 11 <br />11 30 13 Residential Appliances 11/6/2023 <br />DIVISION 12 <br />12 24 00 Window Shades 11/6/2023 <br />12 36 00 Countertops 11/6/2023 <br />PAGE: 5 of 6
The URL can be used to link to this page
Your browser does not support the video tag.