My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Municipal Building - TI <br />ATTACHMENT D - DOCUMENT LIST <br />BID PACKAGE MANUAL <br />FORM OF CONTRACT <br />00 52 00 <br />DIVISION 13 <br />13 08 00 Seismic Restraint For Non-Structural Components 11/6/2023 <br />DIVISION 14 <br />14 21 00 Electric Traction Elevators 11/6/2023 <br />DIVISION 20 <br />20 00 00 General Mechanical Requirements 11/6/2023 <br />DIVISION 21 <br />21 13 15 Wet Pipe Automatic Sprinkler Systems for Tenant Improvements 11/6/2023 <br />DIVISION 22 <br />22 05 13 Common Motor Requirements for Plumbing Equipment 11/6/2023 <br />22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 11/6/2023 <br />22 05 23 General-Duty Valves for Plumbing Piping 11/6/2023 <br />22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment 11/6/2023 <br />22 07 19 Plumbing Piping Insulation 11/6/2023 <br />22 10 05 Plumbing Piping 11/6/2023 <br />22 10 06 Plumbing Piping Specialties 11/6/2023 <br />22 30 00 Plumbing Equipment 11/6/2023 <br />22 40 00 Plumbing Fixtures 11/6/2023 <br />DIVISION 23 <br />23 05 13 Motors & Variable Drives 11/6/2023 <br />23 05 23 Valves for HVAC Piping 11/6/2023 <br />23 05 29 Hangers & Supports for HVAC Piping & Equipment 11/6/2023 <br />23 05 48 Vibration & Seismic Control 11/6/2023 <br />23 05 53 Mechanical Identification for HVAC Piping & Equipment 11/6/2023 <br />23 05 93 Air System Testing & Balancing 11/6/2023 <br />23 05 95 Water System Balancing 11/6/2023 <br />23 07 13 Equipment Ductwork Insulation 11/6/2023 <br />23 07 19 HVAC Piping Insulations 11/6/2023 <br />23 09 00 Energy Management & Controls (DDC) 11/6/2023 12/6/2023 12/8/2023 <br />23 11 19 HVAC Piping Specialties 11/6/2023 <br />23 11 23 Pumps for HVAC Equipment 11/6/2023 12/8/2023 <br />23 20 00 Hydronic System 11/6/2023 12/8/2023 <br />23 21 00 Sleeves & Seals for HVAC Piping & Equipment 11/6/2023 <br />23 23 00 Refrigerant Piping System 11/6/2023 <br />23 25 00 Water Treatment (Hydronic Systems) 11/6/2023 <br />23 31 13 Steel Ductwork 11/6/2023 <br />23 33 00 HVAC Specialties 11/6/2023 12/6/2023 <br />23 34 23 Exhaust Fans 11/6/2023 <br />23 36 00 VAV Terminal Box Units 11/6/2023 <br />23 37 00 Air Terminals 11/6/2023 <br />23 52 33 Boiler (Electric) 11/6/2023 <br />23 64 00 Air Cooled Chillers 11/6/2023 12/6/2023 <br />23 73 00 Air Handling Units with Coils 11/6/2023 12/6/2023 <br />23 81 45 Variable Refrigerant Zone System 11/6/2023 <br />23 90 00 Mechanical Demolition 11/6/2023 <br />DIVISION 26 <br />26 00 00 Electrical General Conditions 11/6/2023 <br />26 00 05 Electrical-Existing Systems 11/6/2023 <br />26 05 19 Wires and Cables 11/6/2023 12/6/2023 <br />26 05 26 Grounding 11/6/2023 <br />26 05 32 Outlet and Pull Boxes 11/6/2023 <br />26 05 33 Raceway 11/6/2023 <br />26 05 34 Metal Clad Cable (Type MC) and Fittings 11/6/2023 <br />26 05 39C Floor Outlet Devices Poke Through 11/6/2023 <br />26 05 73 Electrical System Studies 11/6/2023 <br />26 09 23 Network Digital Lighting Control System 11/30/2023 <br />26 22 13 Dry-Type Transformers 11/6/2023 <br />26 24 13 Switchboards 11/6/2023 <br />26 24 16 Panelboards 11/6/2023 <br />26 24 19 Motor Controllers 11/6/2023 <br />26 27 26 Switches Receptacles 11/6/2023 <br />26 28 13 Fuses 11/6/2023 <br />26 28 16 Disconnects & Fused Switches 11/6/2023 <br />26 32 13.16 Emergency Generator 11/6/2023 <br />26 36 23 Automatic Transfer Switches Time Delay Neutral 11/6/2023 <br />26 43 00 TVSS_TPS & IT 11/6/2023 <br />26 50 00 Lighting 11/6/2023 <br />DIVISION 27 <br />27 00 00 Low Voltage Systems General Requirements 11/6/2023 <br />27 05 28 Pathways for Communications Systems 11/6/2023 <br />27 20 00 Data and Voice Infrastructure 11/6/2023 <br />DIVISION 28 <br />28 13 00 Access Control System 11/6/2023 <br />28 16 00 Intrusion Alarm System 11/6/2023 <br />28 31 76 Fire Alarm and Emergency Comm System 11/6/2023 12/12/2023 <br />APPENDIX <br />Appendix A Asbestos Report 11/6/2023 <br />PAGE: 6 of 6
The URL can be used to link to this page
Your browser does not support the video tag.