My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Municipal Building - TI <br />ATTACHMENT D - DOCUMENT LIST <br />BID PACKAGE MANUAL <br />FORM OF CONTRACT <br />00 52 00 <br />DRAWINGS CHANGE #1 CHANGE #2 CHANGE #3 CHANGE #4 <br />SHEET NUMBER SHEET NAME DATE DATE DATE DATE DATE <br />VOLUME 1 <br />GENERAL <br />G0.01 TITLE SHEET 11/6/2023 <br />G0.02 DRAWING INDEX 11/6/2023 <br />G0.03 PROJECT GENERAL NOTES, SYMBOLS, & ABBREVIATIONS 11/6/2023 <br />G1.10 CODE ANALYSIS 11/6/2023 <br />G1.11 CODE ANALYSIS - FIRST FLOOR 11/6/2023 <br />G1.12 CODE ANALYSIS - SECOND FLOOR 11/6/2023 <br />G1.13 CODE ANALYSIS - THIRD FLOOR 11/6/2023 <br />G1.14 CODE ANALYSIS - FOURTH FLOOR 11/6/2023 <br />G1.15 CODE ANALYSIS - FIFTH FLOOR 11/6/2023 <br />G1.16 CODE ANALYSIS - SIXTH FLOOR 11/6/2023 <br />G1.17 CODE ANALYSIS - SEVENTH FLOOR 11/6/2023 <br />G1.18 CODE ANALYSIS - EIGHTH FLOOR 11/6/2023 <br />G1.19 CODE ANALYSIS - NINTH FLOOR 11/6/2023 <br />G1.20 CODE ANALYSIS - TENTH FLOOR 11/6/2023 <br />ARCHITECTURAL <br />A0.01 TYPICAL ADA ACCESSIBILITY 11/6/2023 <br />A0.02 TYPICAL ASSEMBLY DETAILS 11/6/2023 12/6/2023 <br />AD1.10 PARKING LEVEL DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.11 FIRST FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.12 SECOND FLOOR DEMOLITION FLOOR PLAN 11/6/2023 12/8/2023 <br />AD1.13 THIRD FLOOR DEMOLITION FLOOR PLAN 11/6/2023 12/8/2023 <br />AD1.14 FOURTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 12/8/2023 <br />AD1.15 FIFTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.16 SIXTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.17 SEVENTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 12/8/2023 <br />AD1.18 EIGHTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.19 NINTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.20 TENTH FLOOR DEMOLITION FLOOR PLAN 11/6/2023 <br />AD1.81 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.82 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.83 THIRD FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.84 FOURTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.85 FIFTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.86 SIXTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.87 SEVENTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.88 EIGHTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.89 NINTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD1.90 TENTH FLOOR DEMOLITION REFLECTED CEILING PLAN 11/6/2023 <br />AD2.01 DEMOLITION ROOF PLAN 11/6/2023 <br />A1.01 SITE PLAN 11/6/2023 <br />A1.10 PARKING LEVEL FLOOR PLAN 11/6/2023 <br />A1.11 FIRST FLOOR PLAN 11/6/2023 11/30/2023 <br />A1.12 SECOND FLOOR PLAN 11/6/2023 11/30/2023 12/8/2023 <br />A1.13 THIRD FLOOR PLAN 11/6/2023 12/8/2023 <br />A1.14 FOURTH FLOOR PLAN 11/6/2023 12/8/2023 <br />A1.15 FIFTH FLOOR PLAN 11/6/2023 <br />A1.16 SIXTH FLOOR PLAN 11/6/2023 <br />A1.17 SEVENTH FLOOR PLAN 11/6/2023 12/8/2023 <br />A1.18 EIGHTH FLOOR PLAN 11/6/2023 <br />A1.19 NINTH FLOOR PLAN 11/6/2023 <br />A1.20 TENTH FLOOR PLAN 11/6/2023 11/30/2023 <br />A1.40 SCHEDULE OF INTERIOR FINISHES 11/6/2023 <br />A1.41 FIRST FLOOR FINISH PLAN 11/6/2023 <br />A1.42 SECOND FLOOR FINISH PLAN 11/6/2023 11/30/2023 <br />A1.43 THIRD FLOOR FINISH PLAN 11/6/2023 <br />A1.44 FOURTH FLOOR FINISH PLAN 11/6/2023 <br />A1.45 FIFTH FLOOR FINISH PLAN 11/6/2023 <br />A1.46 SIXTH FLOOR FINISH PLAN 11/6/2023 <br />A1.47 SEVENTH FLOOR FINISH PLAN 11/6/2023 <br />A1.48 EIGHTH FLOOR FINISH PLAN 11/6/2023 <br />A1.49 NINTH FLOOR FINISH PLAN 11/6/2023 <br />A1.50 TENTH FLOOR FINISH PLAN 11/6/2023 <br />A1.80 PARKING LEVEL REFLECTED CEILING PLAN 11/6/2023 <br />A1.81 FIRST FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.82 SECOND FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.83 THIRD FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.84 FOURTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.85 FIFTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.86 SIXTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.87 SEVENTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.88 EIGHTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.89 NINTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A1.90 TENTH FLOOR REFLECTED CEILING PLAN 11/6/2023 <br />A2.01 ROOF PLAN 11/6/2023 <br />A2.10 BUILDING ELEVATIONS 11/6/2023 <br />A2.11 BUILDING ELEVATIONS 11/6/2023 <br />A3.01 ELEVATOR CORE ENLARGED PLANS & SECTIONS 11/6/2023 <br />A3.02 ELEVATOR CORE SECTIONS 11/6/2023 <br />A4.10 ENLARGED PLANS 11/6/2023 11/30/2023 <br />A4.11 ENLARGED PLANS 11/6/2023 <br />A4.12 ENLARGED PLANS 11/6/2023 <br />A4.20 INTERIOR ELEVATIONS 11/6/2023 11/30/2023 12/8/2023 <br />A4.21 INTERIOR ELEVATIONS 11/6/2023 <br />A4.22 INTERIOR ELEVATIONS 11/6/2023 11/30/2023 <br />A4.23 INTERIOR ELEVATIONS 11/6/2023 11/30/2023 <br />A4.24 INTERIOR ELEVATIONS 11/6/2023 <br />A4.25 INTERIOR ELEVATIONS 11/6/2023 <br />A4.26 INTERIOR ELEVATIONS 11/6/2023 <br />A5.10 EXTERIOR DETAILS 11/6/2023 12/6/2023 <br />A5.12 ROOF DETAILS 11/6/2023 <br />A5.20 INTERIOR DETAILS - CEILINGS 11/6/2023 <br />A5.21 INTERIOR DETAILS - WALLS 11/6/2023 <br />A5.22 INTERIOR DETAILS - WALLS 11/6/2023 <br />A5.23 INTERIOR DETAILS - LOBBY 11/6/2023 <br />A5.24 INTERIOR DETAILS - PERMIT CENTER 11/6/2023 <br />A5.25 CASEWORK DETAILS 11/6/2023 <br />PAGE: 1 of 6
The URL can be used to link to this page
Your browser does not support the video tag.