My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders 4/5/2024 Amendment 2
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders 4/5/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 8:25:55 AM
Creation date
4/5/2024 8:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders
Approval Date
4/5/2024
Council Approval Date
3/20/2024
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB-PW Tenant Improvements Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003791
Total Compensation
$24,753,258.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Municipal Building - TI <br />ATTACHMENT D - DOCUMENT LIST <br />BID PACKAGE MANUAL <br />FORM OF CONTRACT <br />00 52 00 <br />A5.26 CASEWORK DETAILS 11/6/2023 <br />A5.27 CASEWORK DETAILS 11/6/2023 <br />A5.28 INTERIOR DETAILS - FLOORING 11/6/2023 <br />A5.30 ELEVATOR DETAILS 11/6/2023 <br />A6.10 DOOR SCHEDULE AND TYPES 11/6/2023 <br />A6.11 WINDOW SCHEDULE 11/6/2023 <br />A6.12 DOOR AND RELITE DETAILS 11/6/2023 <br />A7.10 PARKING LEVEL SIGNAGE PLAN 11/6/2023 <br />A7.11 FIRST FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.12 SECOND FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.13 THIRD FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.14 FOURTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.15 FIFTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.16 SIXTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.17 SEVENTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.18 EIGHTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.19 NINTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.20 TENTH FLOOR SIGNAGE PLAN 11/6/2023 <br />A7.21 SIGNAGE TYPES 11/6/2023 <br />A8.11 FIRST FLOOR FURNITURE PLAN 11/6/2023 <br />A8.12 SECOND FLOOR FURNITURE PLAN 11/6/2023 11/30/2023 <br />A8.13 THIRD FLOOR FURNITURE PLAN 11/6/2023 <br />A8.14 FOURTH FLOOR FURNITURE PLAN 11/6/2023 <br />A8.17 SEVENTH FLOOR FURNITURE PLAN 11/6/2023 <br />A8.18 EIGHTH FLOOR FURNITURE PLAN 11/6/2023 <br />STRUCTURAL <br />S0.00 STRUCTURAL GENERAL NOTES 11/6/2023 11/30/2023 <br />S0.20 TYPICAL INTERIOR LIGHT GAGE STEEL DETAILS 11/6/2023 12/6/2023 <br />S0.21 TYPICAL INTERIOR LIGHT GAGE STEEL DETAILS 11/6/2023 <br />S5.51 DETAILS 11/6/2023 11/30/2023 <br />MECHANICAL <br />M0.01 MECHANICAL LEGEND 11/6/2023 12/8/2023 <br />MD1.10 GARAGE MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.11 FIRST FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.12 SECOND FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.13 THIRD FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.14 FOURTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.15 FIFTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.16 SIXTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.17 SEVENTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.18 EIGHTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.19 NINTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD1.20 TENTH FLOOR MECHANICAL DEMOLITION PLAN 11/6/2023 <br />MD2.01 OVERALL ROOF & PENTHOUSE MECHANCIAL DEMOLITION PLAN 11/6/2023 <br />M1.01 GARAGE MECHANICAL PLAN 11/6/2023 <br />M1.02 FIRST FLOOR MECHANICAL PLAN 11/6/2023 12/6/2023 <br />M1.03 SECOND FLOOR MECHANICAL PLAN 11/6/2023 12/6/2023 <br />M1.04 THIRD FLOOR MECHANICAL PLAN 11/6/2023 12/6/2023 <br />M1.05 FOURTH FLOOR MECHANICAL PLAN 11/6/2023 12/6/2023 <br />M1.06 FIFTH FLOOR MECHANICAL PLAN 11/6/2023 <br />M1.07 SIXTH FLOOR MECHANICAL PLAN 11/6/2023 <br />M1.08 SEVENTH FLOOR MECHANICAL PLAN 11/6/2023 12/6/2023 <br />M1.09 EIGHTH FLOOR MECHANICAL PLAN 11/6/2023 <br />M1.10 NINTH FLOOR MECHANICAL PLAN 11/6/2023 <br />M1.11 TENTH FLOOR MECHANICAL PLAN 11/6/2023 <br />M1.21 OVERALL ROOF & PENTHOUSE MECHANICAL PLAN 11/6/2023 11/30/2023 <br />M1.22 OVERALL ROOF & PENTHOUSE MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 12/6/2023 <br />M1.31 ROOF & PENTHOUSE MECHANICAL PHASING PLANS I 11/6/2023 12/6/2023 <br />M1.32 ROOF & PENTHOUSE MECHANICAL PHASING PLANS II 11/6/2023 12/6/2023 <br />M2.01 FIRST FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 12/6/2023 <br />M2.02 SECOND FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.03 THIRD FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.04 FOURTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.05 FIFTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.06 SIXTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.07 SEVENTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.08 EIGHTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.09 NINTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M2.10 TENTH FLOOR MECHANICAL PIPING PLAN 11/6/2023 11/30/2023 <br />M3.01 FIRST FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 12/6/2023 <br />M3.02 SECOND FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 12/6/2023 <br />M3.03 THIRD FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 12/6/2023 <br />M3.04 FOURTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 12/6/2023 <br />M3.05 FIFTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 <br />M3.06 SIXTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 <br />M3.07 SEVENTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 12/6/2023 <br />M3.08 EIGHTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 <br />M3.09 NINTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 <br />M3.10 TENTH FLOOR MECHANICAL REFLECTED CEILING PLAN 11/6/2023 <br />M4.01 ENLARGED MECHANICAL PLANS I 11/6/2023 12/6/2023 <br />M4.11 EXISTING MECHANICAL SECTIONS I 11/6/2023 <br />M5.01 MECHANICAL DETAILS I 11/6/2023 <br />M5.02 MECHANICAL DETAILS II 11/6/2023 <br />M5.03 MECHANICAL DETAILS III 11/6/2023 11/30/2023 <br />M6.01 MECHANICAL SCHEDULES I 11/6/2023 12/6/2023 <br />M6.02 MECHANICAL SCHEDULES II 11/6/2023 11/30/2023 <br />M6.03 MECHANICAL SCHEDULES III 11/6/2023 12/6/2023 12/8/2023 <br />M6.04 MECHANICAL SCHEDULES IV 11/6/2023 11/30/2023 <br />M6.05 MECHANICAL SCHEDULES V 11/6/2023 11/30/2023 <br />M6.06 MECHANICAL SCHEDULES VI 11/6/2023 11/30/2023 <br />M6.07 MECHANICAL SCHEDULES VII 11/6/2023 11/30/2023 12/6/2023 <br />M6.08 MECHANICAL SCHEDULES VIII 11/6/2023 <br />M6.09 MECHANICAL SCHEDULES VIIII 11/6/2023 11/30/2023 <br />M7.01 MECHANICAL CONTROLS I 11/6/2023 <br />M7.02 MECHANICAL CONTROLS II 11/6/2023 12/6/2023 <br />M7.03 MECHANICAL CONTROLS III 11/6/2023 12/6/2023 <br />M7.04 MECHANICAL CONTROLS IV 11/6/2023 12/6/2023 <br />M7.05 MECHANICAL CONTROLS V 11/6/2023 <br />M7.06 MECHANICAL CONTROLS VI 11/6/2023 <br />PLUMBING <br />P0.01 PLUMBING LEGEND & GENERAL NOTES 11/6/2023 <br />PAGE: 2 of 6
The URL can be used to link to this page
Your browser does not support the video tag.