My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Department of Ecology 4/5/2024
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington Department of Ecology 4/5/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:56:42 AM
Creation date
4/5/2024 10:55:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Department of Ecology
Approval Date
4/5/2024
Council Approval Date
3/13/2024
End Date
1/30/2026
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
PGSF Ecology Water Quality Grant Agreement
Tracking Number
0004289
Total Compensation
$3,765,954.75
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 of 41State of Washington Department of Ecology <br />Agreement No: <br />Project Title: <br />Recipient Name: <br />WQC-2024-EverPW-00027 <br />City of Everett Port Gardner Water Quality Program – Phase 1 Design <br />City of Everett <br />area within the Port Gardner Bay/WRIA 7 watershed. <br /> <br />Phase 1 of the project will include design of regional stormwater treatment and conveyance for approximately 204 acres <br />of currently separated (Sewer M soon to be separated stormwater drainage basins (Grand Avenue Utility Project 1 <br />(GAUP1)/Grand Avenue Utility Project 2 (GAUP2) Basins). The 145-acre Sewer M Basin currently has 100 percent <br />stormwater separation with the required treatment being provided by the Everett Water Pollution Control Facility . <br />Stormwater flows in the Sewer M Basin that exceed treatment flows currently overflow to Port Gardner Bay via Puget <br />Sound Outfall #3. The combined 59-acre GAUP1/GAUP2 Basin currently has no existing stormwater separation, <br />however, a design to separate the stormwater within the GAUP1 Basin has been completed. Design for stormwater <br />separation within the GAUP2 Basin is in the planning stage. Construction of GAUP1/GAUP2 stormwater separation <br />projects are anticipated to commence following completion of the PGSF site and conveyance projects with GAUP1 <br />stormwater separation anticipated in 2029 and GAUP2 stormwater separation anticipated in 2030. <br /> In this project, the RECIPIENT will design stormwater control, conveyance, treatment, and pumping facilities on the <br />PGSF site, as well as three large diameter stormwater conveyance pipelines that will connect completed and near -term <br />stormwater separation projects to the PGSF. Contech CDS pretreatment units will be distributed across contributing <br />watersheds. The treatment, equalization, and effluent pumping infrastructure will be located at the PGSF. The treated <br />stormwater effluent will be discharged into the RECIPIENT’s Deep-Water Outfall 100 into Possession Sound. Phase I <br />includes designs of three stormwater conveyance pipelines. First, a pipe will be installed between Grand Avenue Park <br />Bridge and PGSF site and will divert stormwater flow from the Sewer M Basin to PGSF. Second, a pipeline will be <br />installed along Everett Avenue between Grand Avenue and West Marine View Drive to pick up flows from the GAUP 1 <br />and GAUP 2 Basins and will also connect to a third pipeline. The third pipeline will take separated stormwater flows to <br />the PGSF site. This third pipeline is being sized to take additional separated stormwater flows from future phases of the <br />program. <br />Overall Goal: <br />This project will help protect and restore water quality in Washington state by reducing stormwater impacts from <br />existing infrastructure and development. <br />Template Version 12/10/2020 <br />DocuSign Envelope ID: 2DF274CE-6C6B-457B-9CB5-5C001EEC8A15
The URL can be used to link to this page
Your browser does not support the video tag.