Laserfiche WebLink
30 feet. rm also concerned about the substantially smaller transfer beam atme one end that will be supporting the <br />pad for a 30+plus span. If you want to remove the Intermr support or reduce the beam she, or both, this should be <br />submitted as a revision aIon gwitb the supporting structural cal curl at ion yI anticipate this will not comply with the <br />prescriptive limitations of the IRC and therefore an engineered design is required per Section 301.1.3. <br />Drew Martin, P.E., S.E. <br />WE Associ ate Engineer —Commercial Plans Exam Iner l Permit Services <br />425.257.8810 13200 Cedar Street, 2'o Floor, Everett, WA 98201 <br />Phone Xours: M/W/T Sam -12 pm & 1 pm— 3 pm; Tu: 1:00pm-3:00pm <br />erettwa.eov/permits I Deduced I Twitter <br />antl att,,hrvnbu,dtoantl fiom the Cltkof Everett arepublic remrdsantl <br />Retl orAt.[ <br />From: Dean oarmrs <dean darlmis0gmai .coma <br />Same Monday, October 25, 202112:24 PM <br />To: Engineering /Public Services (PW(<evteos0everettwaug > <br />Cc: Alex scrolls <dariotis20onail.comr, Cindy Rergsma <CReresma0everettwa.eovr, tiro lapatsin <br /><tfmlapatsfn@yahoo.coma <br />Subject [EXTERNAL] Re: R2109-076 6125 SYCAMORE PL <br />CAUTON: This small originated from outside of the organization. Do not stick Inks or open allachments unless you <br />recognize the sender and know the content Is safe. <br />Tawnya, I believe Poe approved plan set provided by Everett to the Owner has Option 2 (which shows Poe <br />shorter span and smaller glu-lam) crossed out. Alex and I were just trying to clarify that Poe Owner <br />prefers this Option 2 and wisher to have that be approved. Sc if neede to be presented to the plans <br />examiner, Poet please do ss. <br />Thank you, and contact me for anyfurfher inforriatlon. <br />