My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/10/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 11:55:51 AM
Creation date
4/17/2024 11:55:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/10/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jamielee Graves
Subject / Project Title
2024 Water, Filtration, Sewer, and Stormwater Rate Study
Tracking Number
0004302
Total Compensation
$185,625.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of the <br />Mayor’s signature below and is between the City of Everett, a Washington municipal corporation <br />(the “City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). <br />This Agreement is for the purpose of the Service Provider providing services to the City as set <br />forth in the Agreement. This Agreement includes and incorporates the Basic Provisions, the <br />attached General Provisions, the attached scope of work (Exhibit A), and the attached method of <br />compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />HDR Engineering, Inc. <br />929 108th Ave, Suite 1300 <br />Bellevue, WA 98001 <br />Shawn.koorn@hdrinc.com <br />City Project <br />Manager <br />Jamielee Graves <br />City of Everett – Public Works <br />3200 Cedar Street <br />Everett, WA 98201 <br />jgraves@everettwa.gov <br />Brief Summary of <br />Scope of Work 2024 Water, Filtration, Sewer, and Stormwater Rate Study <br />Completion Date December 31, 2025 <br />Maximum <br />Compensation <br />Amount <br />$185,625
The URL can be used to link to this page
Your browser does not support the video tag.