My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 11/18/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 11/18/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:06:20 AM
Creation date
11/21/2025 11:05:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
11/18/2025
Council Approval Date
11/5/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Water, Filtration, Sewer, Stormwater Rate Modeling and Implementation
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004302
Total Compensation
$85,710.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 4/10/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> AMENDMENT NO. 1 PROFESSIONAL SERVICES AGREEMENT <br />This Amendment to Professional Services Agreement (“Amendment”) is effective as of <br />the date of last signature below, and is between the City of Everett, a Washington municipal <br />corporation (the “City”), and the Service Provider identified below (“Service Provider”). The City <br />and Service Provider are parties to the Professional Services Agreement described below, as may <br />have been previously amended ("Agreement"). In consideration of the covenants, terms and <br />conditions set forth below, and for good and valuable consideration, the receipt and sufficiency <br />of which are hereby acknowledged, the City and Service Provider agree to amend the Agreement <br />as set forth below: <br />Service Provider HDR Engineering, Inc. <br />City Project Manager <br />Shaun Bridge <br />sbridge@everettwa.gov <br />Original <br />Agreement Date <br /> <br />4/8/2024 <br /> <br />AMENDMENTS <br />New Completion Date <br />If this Amendment changes the Completion Date, enter the new Completion Date: 12/31/2027 If no new date is entered, this Amendment does not change the Completion Date. <br />New Maximum Compensation Amount <br />If this Amendment changes compensation, complete the following table. If the table is not completed, this Amendment does not change compensation. <br />Maximum Compensation Amount Prior to this Amendment $185,625 <br />Compensation Added (or Subtracted) by this Amendment $85,710 <br />Maximum Compensation Amount After this Amendment $271,335 <br />
The URL can be used to link to this page
Your browser does not support the video tag.