My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 4/10/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 4/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:06:21 AM
Creation date
4/17/2024 11:55:16 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
4/10/2024
Council Approval Date
3/27/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jamielee Graves
Subject / Project Title
2024 Water, Filtration, Sewer, and Stormwater Rate Study
Tracking Number
0004302
Total Compensation
$185,625.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 11/18/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />This scope of services will provide a comprehensive review of the City’s water, water filtration, <br />sewer, and stormwater rates. It will result in updated rates for each utility for a multi-year period <br />(e.g., 1-4 years). The tasks are identical for each utility unless otherwise specified. Provided <br />below is a more detailed discussion of the scope of services for the City’s study. <br />Task 1 – Data Collection and Kick-Off Meeting <br />A two-hour in person kick-off meeting will be held with City staff to discuss key issues and <br />objectives and discuss the data and information necessary to complete the study. HDR will <br />provide a written data request to the City in advance of the kick-off meeting. This request <br />should be similar to the data and information provided to HDR as a part of the City’s last <br />comprehensive rate study. After the meeting, HDR will follow-up with City staff (via telephone / <br />email) for any additional items or explanations, as necessary. As a part of the meeting, HDR <br />will also review the City’s current rate models to determine the updates and revisions to the rate <br />models (Task 2). <br />Task 1 Assumptions: <br />A two-hour in person kick-off meeting with the HDR project manager and technical lead. <br />The City will provide the data necessary to complete the requested analyses. <br />Task 1 Deliverables: <br />Electronic version of the written data request. <br />Task 2: Rate Model Update and Development <br />As a part of the prior rate studies, HDR developed and refined the City’s rate models. This task <br />will result in revised and updated rate model(s) for the City. HDR and City staff will collaborate <br />and determine the model revisions and updates to meet the City’s modeling goals and <br />objectives. Given the input from Task 1, HDR will make the initial updates to the rate model. As <br />part of this task, up to two, two-hour, virtual project meetings will be held to review and discuss <br />the model and updates. A final two-hour in person project meeting will be held to review and <br />discuss the development of the rate model(s). At the conclusion of this meeting, a final rate <br />model(s) will be developed for the rate study analysis. <br />Task 2 Assumptions: <br />Collaborate with City staff to develop the final rate model(s) to be developed for the rate <br />study. <br />Up to two, two-hour, virtual project meetings to review the development of the rate <br />model(s). <br />A two-hour in person project meeting to review draft rate model(s). <br />Task 2 Deliverables: <br />An electronic copy of the rate model(s) developed for use in the development of the rate <br />study. <br />Task 3: Financial Benchmarking Analysis <br />As a part of the prior comprehensive rate studies, a high-level financial benchmarking analysis <br />was provided. The following financial performance indicators for business operations were <br />reviewed in the prior study: <br />Debt Ratio <br />Return on Assets (%)
The URL can be used to link to this page
Your browser does not support the video tag.