My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates, Inc. 4/17/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Krazan & Associates, Inc. 4/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 12:00:22 PM
Creation date
4/17/2024 11:59:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates, Inc.
Approval Date
4/17/2024
End Date
12/31/2024
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Geotechnical exploration and engineering for Water Main Replacement “X”
Tracking Number
0004304
Total Compensation
$27,751.30
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KRAZAN & ASSOCIATES, INC.Proposal No. G24295WAL <br />Everett Watermain Replacement “X” <br />Everett, WA <br />March 22, 2024 <br />Revised April 2, 2024 <br />Page 4 <br />Krazan & Associates, Inc. <br />Offices Serving the Western United States <br />will include the results of our field exploration and laboratory tests, and geotechnical <br />conclusions and recommendations for the design and construction of the project. At a <br />minimum, our report will provide the following information: <br />Geotechnical parameters for trench shoring design including lateral <br />pressures, and partial shoring considerations; <br />Excavation and temporary slope considerations; <br />Pipe support including bedding and backfilling, and discussion regarding any <br />areas of inadequate pipe foundation conditions encountered in the <br />explorations; <br />Construction dewatering considerations including depth to groundwater <br />observed during drilling and estimated permeability coefficients based on <br />laboratory sieve analyses; <br />The evaluation of soil corrosiveness will include laboratory testing for soil <br />pH, chloride and sulfate content. Soil resistivity testing is not planned as part <br />of this scope, but can be performed if needed, under a separate contract. The <br />glacial soils anticipated in these project areas typically have a low potential <br />for corrosion; <br />Recommendations for seismic design considerations based on the 2021 IBC, <br />including site coefficient and ground acceleration; <br />Recommendations for erosion control during construction. <br />We plan to submit the geotechnical engineering report via email as a pdf file. Hard copies <br />of the geotechnical report can be provided on request. The services will be performed in <br />accordance with generally accepted standards of the geotechnical engineering profession. <br />All reports will be signed and stamped by a State of Washington registered professional <br />engineer. <br />5.Geotechnical Communications, Design Report and Meetings <br />A Statement of Qualifications and the resumes of key personnel are attached to this <br />proposal. Our geotechnical engineer and geologist will be available to provide a summary <br />of the subsurface conditions encountered in the explorations and answer questions after <br />the field work is completed. During the construction phase of the project, our <br />representative will be available, under a separate contract, to travel to the site on an as- <br />needed basis to observe the soil conditions to confirm that they are consistent with the <br />findings of our geotechnical evaluation. A separate cost estimate for construction <br />monitoring can be given at a later date, at your request. Krazan would be available to <br />coordinate with the City’s survey consultant to allow time to locate the borings and <br />establish ground elevations. <br />6.Project Milestones <br />The project schedule in Exhibits A-1 indicates the Notice to Proceed (NTP) will be <br />available by April 15, 2024.
The URL can be used to link to this page
Your browser does not support the video tag.