My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates, Inc. 4/17/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Krazan & Associates, Inc. 4/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 12:00:22 PM
Creation date
4/17/2024 11:59:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates, Inc.
Approval Date
4/17/2024
End Date
12/31/2024
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Geotechnical exploration and engineering for Water Main Replacement “X”
Tracking Number
0004304
Total Compensation
$27,751.30
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KRAZAN & ASSOCIATES, INC.Proposal No. G24295WAL <br />Everett Watermain Replacement “X” <br />Everett, WA <br />March 22, 2024 <br />Revised April 2, 2024 <br />Page 5 <br />Krazan & Associates, Inc. <br />Offices Serving the Western United States <br />The fieldwork would commence as soon as possible upon receiving your authorization to <br />proceed, upon obtaining utility clearances, and based on the availability of the <br />subcontracted flaggers and drill rig. We will begin laboratory testing immediately upon <br />completing the field exploration. <br />We intend to submit a Draft Report on or before May 15, 2024. We anticipate submitting <br />our Final Geotechnical Engineering Report within one week of receiving review notes of <br />the draft report from our client. <br />7.Prevailing Wages <br />Our cost estimate includes prevailing wages for drilling and traffic control operations. <br />COST ESTIMATE <br />We estimate the cost for conducting this geotechnical engineering study on a time and materials basis to <br />be about $27,751.30. A detailed breakdown of this cost estimate is attached to this proposal for your <br />review.We have also included a copy of the WSDOT Acceptance FYE 2021 ICR letter for Krazan for <br />your review. <br />In developing this cost estimate, we have assumed that adequate access will be available to the soil boring <br />locations, and that permission to access the site will be provided by you. The estimated total cost is based <br />on our being able to acquire sufficient information with the proposed field investigation methods. If <br />unforeseen conditions are encountered and we are not able to complete the study at the proposed cost, we <br />will contact you immediately to discuss a revised scope of work and a revised cost estimate. <br />We should be able to mobilize and begin our investigation as soon as practical, primarily based on the <br />availability of the subcontracted drill rig, and assuming we have acceptable access to the property.Please <br />arrange access to the site and inform us of the locations of any underground utilities. <br />CLOSURE <br />Thank you for this opportunity to present our proposal for geotechnical engineering services. If you have <br />any questions, feel free to contact us at (425) 485-5519. <br />Sincerely, <br />Krazan & Associates, Inc. <br />Michael D. Rundquist, P.E. <br />Senior Project Engineer <br />Attachment A: Estimated Budget
The URL can be used to link to this page
Your browser does not support the video tag.