My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix, Inc. 4/17/2027 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Parametrix, Inc. 4/17/2027 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 1:55:44 PM
Creation date
4/17/2024 1:55:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix, Inc.
Approval Date
4/17/2027
Council Approval Date
4/10/2024
End Date
12/31/2026
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB PW Tenant Improvements GC/CM
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003381
Total Compensation
$238,343.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Parametrix Inc. 5/31/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
c.Review estimates for change orders for merit, appropriate justification and <br />reasonableness. <br />d.Ensure the records are complete including necessary back-up, lien releases, and <br />approvals. <br />3. Time Management: The Project Manager/Construction Manager will assist the Project team <br />to endeavor to ensure that the approved contractor construction schedule supports the master <br />schedule and milestone dates. The Project Manager will assist the project team to monitor the <br />Contractor and master schedule as follows: <br />a.At least monthly, review and assess the performance of the Contractor and other team <br />members. <br />b.Establish a systematic procedure for gathering and analyzing the progress of the Project. <br />c.Establish regular schedule of Project meetings and require that each team member bring <br />all the necessary schedule status information. <br />d.Keep City informed on status of critical path work. Address areas or activities having <br />problems or requiring management attention. <br />e.Track time extension requests, and time extensions granted, pending and denied. <br />f.If necessary, work with Contractor to develop a recovery schedule. <br />4. Quality Management: The Project Manager/Construction Manager will assist the Project <br />team in assuring that construction is completed in accordance with the req uirements of the <br />contract documents. That major elements of the construction phase quality management plan <br />are: <br />a.Preconstruction conference <br />b.Construction planning and scheduling <br />c.Inspection and testing <br />d.Reports and record keeping <br />e.Control of changes in the work <br />f.Document control and distribution <br />g.Nonconforming or deficient work <br />h.Final review, documentation and punch list work completion <br />i.Occupancy <br />j.Substantial and final completion <br />k.Final acceptance <br />5. Project/Contract Administration: The Project Manager/Construction Manager will assist the <br />project team in assuring that documentary evidence of proper contract implementation is <br />managed, maintained, and focused upon fulfilling the scope, cost quality and time requirements <br />for the Project. <br />a.Preconstruction conferences will include administrative and other reporting procedures <br />required.
The URL can be used to link to this page
Your browser does not support the video tag.