My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/04/17 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/04/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 1:41:29 PM
Creation date
4/18/2024 9:15:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />ORDINANCE NO. ________ <br /> <br />An ORDINANCE creating a special improvement project entitled, “Thornton A. Sullivan Park Floating <br />Dock Repairs,” Fund 354, Program 100, to accumulate all design, engineering, and permitting costs for <br />the project. <br /> <br />WHEREAS, <br /> <br />A. The City Council recognizes the need to maintain and improve City Park amenities. <br /> <br />B. The City Council recognizes the value and need to provide Everett residents and visitors with <br />recreation spaces. <br /> <br />C. The City recognizes that the floating docks at T.A. Sullivan Park are in need of repairs and <br />maintenance. <br /> <br /> <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> <br />Section 1. A special improvement project fund is hereby entitled “Thornton A. Sullivan Park <br />Floating Dock Repairs,” Fund 354, Program 100. <br /> <br />Section 2. Authorization is hereby granted to the Parks and Facilities Department Director under <br />the administration of the Mayor, to assume full responsibility for conducting all tasks <br />and performing all necessary steps to accomplish the actions authorized by this <br />Ordinance. <br /> <br />Section 3. The estimated cost of design and permitting is $40,000. <br /> <br />Section 4. The sum of $30,000 is hereby appropriated to Fund 354, Program 100, “Thornton A. <br />Sullivan Park Floating Dock Repairs,” project. <br /> <br />A. Use of Funds <br />Design and Permitting $40,000 <br />Total $40,000 <br />B. Source of Funds <br />CIP 3 $40,000 <br />Total $40,000
The URL can be used to link to this page
Your browser does not support the video tag.