Laserfiche WebLink
EVERETT January 7, 2022 <br /> WASHINGTON Terry Willey <br /> terry@nwqrd.com <br /> Northwest Quality Remodel & Deck <br /> 15419 SR-9 <br /> Snohomish, WA 98296 <br /> Owner: Port of Everett <br /> Project Address: 1720 W Marine View Dr <br /> Plan Check No: B2109-057 <br /> RE: Building Permit Review Letter <br /> Dear Terry, <br /> In response to the application for a building permit, the plans have been <br /> examined and you are advised that revisions may be necessary before a permit <br /> can be issued. Please review and respond to the comments below. <br /> ARCHITECTURAL <br /> 1. The scope of the project appears to include updates to structural systems <br /> and may affect the life safety systems of the existing building (such as the <br /> installation of a sprinkler system, changes in means of egress components <br /> based on occupant load and group, etc.). Per RCW 18.08.410(7), a registered <br /> architect in the state of Washington is required to review and stamp the <br /> architectural plans to address the proposed scope of work where updates to life <br /> safety and structural systems are altered. RCW 18.08.410 (7). <br /> 2. Please list the items such as the Type of Construction, occupancy group, <br /> occupant load associated with the proposed changes as is required for <br /> Certificate of Occupancy issuance. Please update drawings as required. IBC <br /> 111.2. <br /> 3. It appears that the proposed additional square footage created by the <br /> proposed deck at the 1"floor is creating additional building area per the <br /> definition of Building Area in the IBC Chapter 2. Please update the building area <br /> computations such that all building areas (covered walkways, 1st floor deck,the <br /> PERMIT SERVICES existing offices and bathrooms to the west, etc.) are included as it appears that <br /> the total building area is approaching 6000 sq. ft. and may require a NFPA 13 <br /> Q3200 Cedar Street sprinkler system. IBC Section 2, EMC 16.03.090 J. <br /> Everett,WA 98201 <br /> 4. On Sheet"Site",there appears to be a callout of ramp construction on the <br /> 425.257.8810 <br /> 425.257.8857 fax drawings. Please provide construction details on the plans as this appears to be <br /> missing from the drawings. IBC 107.2.1. <br /> ® everetteps@everettwa.gov <br /> `dob' everettwa.gov/permits 5. On Sheet 2 of the proposed floor plan, the revised laundry room appears to <br /> exceed 100 sq ft. Per IBC Table 509,this would appear to require 1 hour fire <br /> Page 1 of 2 <br />