Exhibit A (Scope of Work) <br /> attendance, the documentation of these efforts that will be required, and who is <br /> responsible for this documentation. <br />2. Review Owner Project Requirement (OPR) and Basis of Design (BOD) for clarity <br /> and completeness. <br />3. Develop Cx specifications that can be incorporated into construction documents. <br />4. Perform design review backcheck on the 50% CD or 100% CD drawings to <br /> ensure all previous findings were implemented into design documents. <br />5. Review the Sequence of Operations (SOO) <br />6. Assist the General Contractor (GC) with developing a Commissioning Schedule. <br /> <br />Construction Phase <br />The Hargis CxA shall complete the following tasks during the construction phase: <br /> <br />1. Develop the Commissioning Plan draft which will serve as the roadmap of how <br /> the commissioning process will be implemented. The intention of this plan is to <br /> describe the systems scheduled for commissioning, the nature of the testing to <br /> be performed, key project team member involvement and what documentation is <br /> necessary to meet Cx Requirements. <br />2. Conduct one (1) onsite kickoff commissioning meeting to plan, coordinate, and <br /> schedule commissioning activities, review issues and discuss problem resolution. <br />3. Before startup, gather and review the current control sequences and interlocks <br /> and work with contractors and design engineers until sufficient clarity has been <br /> obtained in writing to be able to write detailed testing procedures. <br />4. Prepare Pre-Functional Test (PFT) scripts to be filled out by EC, GC, BMS, and <br /> equipment vendor during startup for the equipment listed in the equipment scope. <br />5. With necessary assistance and review from installing contractors, write the <br /> Functional Performance Test (FPT) procedures for equipment and systems. <br />6. Perform four (4) site visit to witness the startup procedure for the mechanical <br /> equipment. <br />7. Attend twenty-four (24) hours of teleconference construction meetings (1 MCx <br /> and 1 ECX). <br />Acceptance Phase <br />It is intended to demonstrate that the performance of the equipment and systems meets <br />the requirements of the design documents: <br /> <br />1. (BMS) system annunciation for alarms will be witnessed as they apply to each <br /> piece of equipment listed to be commissioned.