My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/04/24 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/04/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 1:17:28 PM
Creation date
4/25/2024 8:26:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/24/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />2. Obtain pre-functional tests from CM with sign-offs that the systems have been <br /> checked out. <br />3. Manage, direct, and oversee the functional testing of each major piece of <br /> equipment to demonstrate that each item of equipment and system is operating <br /> according to the design intent and contract documents. Functional performance <br /> testing shall include operating the system and components through each of the <br /> written sequences of operation. <br />4. Obtain and review reports from functional testing of each major piece of <br /> equipment. <br />5. Provide Daily Commissioning Reports for each day of the "onsite" portion of the <br /> commissioning process. All Daily Commissioning Reports will be easily <br /> referenced to the master deficiency and resolution log. <br />6. Maintain a master deficiency and resolution log and a separate testing record. <br /> Provide to the CM written progress reports and test results with recommended <br /> actions. <br />7. Conduct brief daily commissioning meetings during the entire "onsite" portion of <br /> the commissioning process. <br /> <br />Post-Commissioning Phase <br />1. Hargis will prepare a Final Commissioning Report within fifteen (15) days of <br /> completion (one (1) soft copy). The report shall include an executive summary, a <br /> list of participants and roles, a brief building description, and the following <br /> sections: <br /> a. Commissioning Plan <br /> b. Commissioning Specification <br /> c. OPR & BOD Review <br /> d. 50% & 100 Design Review <br /> e. Pre-functional Checklist <br /> f. Functional Performance Test Scripts <br /> g. Deficiency Log <br /> h. Daily Commissioning Reports (DCR) <br /> <br />Commissioned Systems <br /> <br />1. The following systems will be commissioned for this project: <br />Mechanical <br />
The URL can be used to link to this page
Your browser does not support the video tag.