My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-92 2024-05-02
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-92
>
3003 W CASINO RD BLDG 40-92 2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:20:23 AM
Creation date
4/26/2024 9:30:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-92
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST-INSTALLED ANCHORS REPORT rerracon <br /> Report Number: M7231643.0004 <br /> Service Date: 12/14/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 12/18/23 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> The Boeing Company Boeing Everett 40-92 SPC Upgrade <br /> Attn: David Duffy 2451 100th St. SW <br /> 3003 W Casino Rd Bldg 40-92 <br /> Everett,WA 98204-1910 Everett,WA <br /> Project Number: M7231643 <br /> Permit: M2310-078 <br /> GENERAL INFORMATION <br /> On site for proprietary anchor inspection per project plans. Inspected Heat pump stands at roof elevation. Heat <br /> pumps 1, 2, 3 & 4 were inspected per drawing SK-2, 3, 4 & 5 dated 10-23-23. <br /> The 1/2" and 3/8" Power stud anchors were inspected. See proprietary anchor sheet for more details. Anchors <br /> were installed per plans. <br /> Inspected seismic attachments for FCU units located on the underside of roof elevation. Per detail 1339.1 and <br /> drawing D2 of 1 SD2S3 dated 12-03-20 and E4.3 drawing. <br /> Cables, anchors, stiffeners and Unistruts were inspected. Units FCU-1, 2, 3, 6, 7, 8, 9, 10 & 11 were inspected <br /> and found per plans. <br /> Unit FCU-10 is a wall support mount which was inspected per SK-1 dated 10-05-23. The #12 SMS screws and <br /> studs are attached per plans. <br /> COMPIANCE STATEMENT <br /> To the best of our knowledge, the items inspected today are in conformance with approved plans and <br /> specifications. <br /> Services: Special Inspections/Materials Testing <br /> Terracon Rep.: Mark Vassallo <br /> Reported To: <br /> Contractor: Skanska USA <br /> Report Distribution: <br /> (1)The Boeing Company,David Duffy (1)Mayes Testing Engineers,Inc, <br /> Melinda Ferguson <br /> (1)Mayes Testing Engineers,Inc, (1)Skanska Balfour Beatty, Reviewed By: <br /> Michael Virailio Christonher Marrinan. <br /> (1)Skanska Balfour Beatty,Miles Argo Michael Virgilio <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.