POST-INSTALLED ANCHORS REPORT rerracon <br /> Report Number: M7231643.0005 <br /> Service Date: 12/29/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 01/05/24 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> The Boeing Company Boeing Everett 40-92 SPC Upgrade <br /> Attn: David Duffy 2451 100th St. SW <br /> 3003 W Casino Rd Bldg 40-92 <br /> Everett, WA 98204-1910 Everett, WA <br /> Project Number: M7231643 <br /> Permit No: B2307-062. <br /> General Information <br /> Charlie MacLeod with UMC requested Terracon to be on site to observe the installation of mechanical anchor(s) being installed by UMC. Results of <br /> observation(s) performed today were reported to Charlie McLeod with UMC. <br /> The construction documents referenced for this observation include: Approved seismic ISAT drawings plans. <br /> Anchor System Information <br /> The following anchor types were used during today's observation: <br /> Anchor No. Anchor Type ICC Report Anchor Dia. Anchor Length Required Referenced <br /> (in.) (in.) Torque (ft-Ib) <br /> 1 Dewalt SD2 ESR-2502 3/8 3 20 D2.1SD2S3 on approved ISAT <br /> drawings <br /> Testing Equipment <br /> Test Equipment Description Calibration Date <br /> 1503 MRFMH 2023-03-29 <br /> Anchor Installation <br /> The above anchors were installed as follows: <br /> Anchor Locations Quantity Hole Depth & Embedment Spacing &Edge Status* <br /> No. (tested/total) Diameter(in.) (in.) Distance (in.) <br /> 1 (1) BC-1 4/4 2 &3/8 2 N/A&N/A Complies <br /> 1 (2) BCV-1 4/4 2 &3/8 2 N/A&N/A Complies <br /> 1 (3) FRV-1 4/4 2 &3/8 2 N/A&N/A Complies <br /> *See below for more information <br /> Holes were cleaned prior to installation by: vacuum, brush. Ambient Temperature during observation was 70° F. <br /> Compliance <br /> Based on our observations and testing,the post-installed anchors referenced above appear to be in general accordance with the project <br /> documents. <br /> Services: Special Inspections/ Materials Testing <br /> Terracon Rep.: Jacob Lee <br /> Reported To: Charlie McLeod with UMC <br /> Contractor: UMC <br /> Report Distribution: <br /> (1)The Boeing Company,David Duffy (1)Mayes Testing Engineers,Inc,Gale <br /> Noyes <br /> (1)Mayes Testing Engineers,Inc, (1)Skanska Balfour Beatty, Reviewed By: <br /> Mh­l Nhr ilio rhricfn her M-in <br /> Skanska Balfour Beatty,Miles Argo <br /> Michael Virgilio <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />