Laserfiche WebLink
7. The 4x4's in the crawl space should be shown as pressure treated. Section R317.1.4. A note was <br /> added. Please see framing plan S1.2 and Detail 18/A5.2 <br /> 8. The mechanical equipment in the garage should be shown to be protected from vehicular <br /> damage by a bollard or other approved protective method. M1307.3.1. A bollard and note were <br /> added to the garage. Please see sheet A1.1 <br /> 9. The plans should show that the building is required to undergo an air leakage test (performed by <br /> a licensed 3rd party agency). The testing requirements should be shown on the plans according to <br /> WA State Energy Code Section R402.4. The scope-of-work(SOW) has been revised. Please <br /> see sheet "A0.1" <br /> 10. Duct testing is required per WA ST Energy Code Section R403.3.3 (see exceptions). The plans <br /> should note the testing requirements. The scope-of-work(SOW) has been revised. Please see <br /> sheet "A0.1" <br /> 11. Project North direction varies between architectural and structural sheets. Please update. The <br /> scope of work has been revised. All Project North direction are constant. <br /> 12. The plans should show a heat pump per the project energy credits. Plans currently show a <br /> furnace. WA State Energy Code Table R406.2 The scope-of-work(SOW) has been revised. <br /> Please see sheet "A1.1" <br /> 13. The plans should show an electric heat pump water heater per the project energy credits. WA <br /> State Energy Code Table R406.3. The scope-of-work(SOW) has been revised. Please see <br /> sheet "A1.1" <br /> STRUCTURAL (For all structural responses,please see letter from Perco Engineering) <br /> 1. Foundation Plan on Sheet S 1.1 should provide post sizes and connections to framing members <br /> and to footings with appropriate post bases. Please provide a detail for isolated spread footings <br /> and key in detail references on the Foundation Plan. R106.1.1 <br /> 2. Foundation plan should provide footings or sufficient design to accommodate all loads at all <br /> bearing wall locations. For example, bearing wall at Office entry doorway, stairway/pantry, and <br /> mudroom. R106.1.1 <br /> 3. See Sheet S 1.3. Provide framing information/detail of exterior wall at stairway. R106.1.1 <br /> Pelletier + Schaar, LLC <br /> 26911 98th Drive NW, Suite B, Stanwood, Washington 98292 p (360) 629-5375 <br />