Laserfiche WebLink
GeoTest Services, Inc. October 8, 2021 <br />2405 Hillside Lane, Everett, WA Project No. 21-0845 <br />PURPOSE AND SCOPE OF SERVICES <br />The purpose of this evaluation is to establish general subsurface conditions beneath the site from <br />which conclusions and recommendations pertaining to project design can be formulated. Our <br />scope of services includes the following tasks: <br />• Explore soil and groundwater conditions underlying the site by advancing 3 test pit <br />explorations via a track -mounted excavator provided by Fullwiler Construction, Inc. <br />• Perform laboratory testing on representative samples to classify and evaluate the <br />engineering characteristics of the soils encountered and to assess on -site infiltration <br />capability. <br />• Provide a written report containing a description of subsurface conditions and exploration <br />logs. The findings and recommendations in this report pertain to site preparation and <br />earthwork, fill and compaction, seismic design, foundation recommendations, concrete <br />slab -on -grade construction, foundation and site drainage, infiltration feasibility, <br />temporary and permanent slopes, geotechnical consultation, and construction <br />monitoring. <br />• Assess Geologically Hazardous Areas (if present) per Everett Municipal Code (EMC). <br />PROJECT DESCRIPTION <br />The rectangular -shaped, approximately 0.68-acre subject property is located west of 24th Ave. <br />W. and south of W. Mukilteo Boulevard in Everett, WA. The project site contains three lots (Lots <br />2, 3, and 4) of a 4-lot short -plat. Lot 1 is located to the south of the proposed development (2405 <br />Hillside Drive). This lot contains a single-family residence and will remain unchanged as part of <br />the new development. The owner of Lot 1 currently owns the three lots described here as of the <br />writing of this report. An existing driveway originating from 241h Ave. W. serves as access to the <br />future homes. GeoTest understands that the subject property will be developed into three single <br />family residences. <br />Due to the presence of an approximately 32-foot-high slope that comprises the subject property, <br />it is expected that some site grading will be required to establish the 3 buildable lots. Preliminary <br />information regarding infiltration or stormwater detention facilities was not available at the time <br />that this report was written. An existing stormwater detention facility exists in the proximity of <br />the private road. Design details of this facility were unavailable at the time that this report was <br />written. <br />1 <br />