Laserfiche WebLink
Alex Byrd <br /> From: Alex Byrd <br /> Sent: Wednesday, December 18, 2019 1:17 PM <br /> To: permits_assist@permabilt.com <br /> Subject: 9 74th Street SW - B1910-042 - Planning Corrections <br /> Hello, <br /> Thank you for submitting a permit to construct a new garage at 9 74th Street SW, permit B1910-042. In order to the <br /> Planning Department to approve the permit, please submit the following: <br /> 1. A Geological Assessment Letter is required because a structure is proposed within 200-feet of potential <br /> geologically hazardous area (medium landslide and erosion hazard areas to the east). <br /> Here is a link to the Critical Areas chapter of the Zoning Code: <br /> https://www.codepubIishing.com/WA/Everett/#!/Everettl9/Everettl937.htm1#19.37. Section <br /> 19.37.070 outlines the types of letters/reports required. <br /> 2. The Average Base Elevation calculated on the site plan is 535.45', but the Average Base Elevation shown on the <br /> elevations is 538.5'. Please revise plans for consistency. <br /> Please let me know if you have any questions. <br /> Thank you, <br /> - Alexandria Byrd <br /> Assistant Planner I Community, Planning & Economic Development <br /> 425.257.7281 13200 Cedar Street 2nd Fl., Everett,WA 98201 <br /> EVERETT everettwa.gov I Facebook I Twitter <br /> 1 <br />